
Because of the weight of the power shelf and the rack-mounted height of the chassis, you should be especially
careful while lifting and removing the power shelf. To prevent injury, keep your back straight and lift with your
legs, not your back. Avoid sudden twists or lateral moves. It is safer to use two people and a ladder to install
or remove the power shelf rather than a single person. After two people have placed the power shelf in position,
one person can slide it into place.
Caution
Step 5
Grasping both handles simultaneously, push both the left and right handles up in at the same time to push the shelf into
the chassis. Slide the shelf all the way into the chassis, pushing in the shelf until both handles hook around the pins.
Make sure both handles swing straight up. Use care not to bend the handles sideways.
Caution
Figure 24: Ejector Handle
Ejector handle pulled away from the shelf
1
Ejector handle pushed up to slide in the shelf
2
Installing and Removing Power Components
48
Installing and Removing Power Components
Steps