
The front and rear views of the modular configuration AC power shelf are shown in the next figures.
Figure 20: AC Modular Configuration Power Shelf—Front View
Figure 21: AC Modular Configuration Power Shelf, Rear View
Prerequisites
Remove the upper grilles from both the front (PLIM) and rear (MSC) sides of the chassis, if installed. Verify
that the power shelf that you are about to install is the correct power shelf.
Installing and Removing Power Components
45
Installing and Removing Power Components
Prerequisites