Table 9: Site Preparation Checklist
Date
Time
Verified
By
Activity
Task No.
Space evaluation
•
Space and layout
•
Floor covering
•
Impact and vibration
•
Lighting
•
Maintenance access
1
Environmental evaluation
•
Ambient temperature
•
Humidity
•
Altitude
•
Atmospheric contamination
•
Airflow
2
Power evaluation
•
Input power type
•
Power receptacles (Depends on power supply)
5
•
Receptacle proximity to the equipment.
•
Dedicated (separate) circuits for redundant power supplies.
•
UPS for power failures
6
3
Grounding evaluation
•
Circuit breaker size
•
CO ground (AC powered systems)
4
Cable and interface equipment evaluation
•
Cable type
•
Connector type
•
Cable distance limitations
•
Interface equipment (transceivers)
5
Cisco Catalyst 6807-XL Switch Hardware Installation Guide
26
OL-30656-01
Preparing for Installation
Site Preparation Checklist