3-10
Catalyst 2960 Switch Hardware Installation Guide
OL-7075-09
Chapter 3 Switch Installation (8-Port Switches)
Installing the Switch
Figure 3-4
Mounting the Switch Under a Desk or Shelf
After the switch is mounted under the desk or shelf, do these tasks to complete the installation:
1.
Power on the switch. See the
“Verifying Switch Operation” section on page 3-5
.
2.
Connect to a 10/100 or 10/100/1000 port, and run Express Setup. See the switch getting started guide
for instructions.
3.
Connect to the front-panel ports. See the
“Connecting to the 10/100 and 10/100/1000 Ports” section
on page 2-14
, the
“Connecting to SFP Modules” section on page 2-18
, and the
“Connecting to a
Dual-Purpose Port” section on page 2-20
to complete the installation.
For configuration instructions about using the CLI setup program, go to
Appendix C, “Configuring the
Switch with the CLI-Based Setup Program.”
1
Desk or shelf
3
Slides on this way
2
Screws
Catalyst 2960
S
eries
S
TAT
DPLX
S
PD
S
Y
S
T
CON
S
OLE
3
1x
2x
3x
4x
5x
6x
7x
8x
1
1
2
204640