2-2
Cisco Aironet 1520 Series Outdoor Mesh Access Point Hardware Installation Guide
OL-12632-02
Chapter 2 Mounting Instructions
Unpacking the Access Point
Unpacking the Access Point
When you are unpacking the access point, do not remove the foam blocks attached to the antenna
connectors. The foam protects the antenna connectors during installation.
Follow these steps to unpack the access point:
Step 1
Open the shipping container and carefully remove the contents.
Step 2
Return all packing materials to the shipping container, and save it.
Step 3
Ensure that all items listed in
are included in the shipment. If any item is damaged or
missing, notify your authorized Cisco sales representative.
Package Contents
Each access point package contains the following items:
•
Access point
•
Cisco product documentation and translated safety warnings
•
Grounding lug with two screws and lock washers
•
Three liquid tight adapters
•
Two-pin DC power connector
•
Ground lug (Panduit PLCD6-10A-L) and screws with lock washers
Tools and Materials that You Supply
•
Ground lug crimping tool (Panduit CT-720 with CD-720-1 die)
•
6-AWG copper ground wire
•
13 mm box-end wrench or socket set
•
Adjustable wrench, 22 mm socket, or Sealcon S-2200-WR socket wrench
•
Small flat screwdriver for DC power connector
•
Optional power injector (AIR-PWRINJ1500-2=)
•
Optional AC power cord
–
40-ft (12.2-m) power cord (AIR-CORD-R3P-40NA=) for light pole installations in the US and
Canada
–
4-ft (1.2-m) streetlight power tap adapter (AIR-PWR-ST-LT-R3P=) for light pole installations
in the US and Canada
•
Antennas, 2.4 and 5 GHz (refer to the
“External Antennas” section on page 1-7
)
•
Optional pole mount kit (AIR-ACCPMK1520=)
•
Optional strand mount kit (AIR-ACCSMK1520=)
•
Optional strap hand tool (AIR-BAND-INST-TL=)