Verification Time and Date
Planning Activity
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Power evaluation:
Input power type
Power receptacles
Receptacle proximity to the
equipment
Dedicated (separate)
circuits for power
redundancy
UPS for power failures
Grounding: proper wire
gauge and lugs
Circuit breaker size
Grounding evaluation:
Data center ground
Cable and interface equipment
evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment
(transceivers)
EMI evaluation:
Cisco Nexus 93180YC-EX ACI Mode Hardware Installation Guide
62
Site Preparation and Maintenance Records
Site Preparation Checklist
Summary of Contents for 9300-EX
Page 6: ...Cisco Nexus 93180YC EX ACI Mode Hardware Installation Guide vi Contents ...
Page 14: ...Cisco Nexus 93180YC EX ACI Mode Hardware Installation Guide 4 Overview Overview ...
Page 67: ...Cisco Nexus 93180YC EX ACI Mode Hardware Installation Guide 57 LEDs Power Supply LEDs ...
Page 68: ...Cisco Nexus 93180YC EX ACI Mode Hardware Installation Guide 58 LEDs Power Supply LEDs ...