Date router received
Router and all accessories unpacked
Types and numbers of interfaces verified
Safety recommendations and guidelines reviewed
Installation Checklist copied
Site log established and background information entered
Site power voltages verified
Site environmental specifications verified
Required passwords, IP addresses, device names, and so on, available
Required tools available
Network connection equipment available
Router mounted in rack (optional)
Cable-management brackets installed (optional but recommended)
AC power cable(s) connected to AC source(s) and router; retention clip secured
DC power cable(s) connected to DC source(s) and router
Captive installation screws on I/O controller and network processing engine or network services
engine checked
Network interface cables and devices connected
ASCII terminal attached to console port
Console port set for 9600 baud, 8 data bits, no parity, and 2 stop bits (9600 8N2)
System power turned on (DC OK LED is on)
System boot complete (I/O controller enabled LED is on)
I/O controller, network processing engine or network services engine, and all port adapters
operational (enabled LEDs on the port adapters and the I/O controller are on)
Correct hardware configuration displayed after system banner appears
System ready for global and interface-specific configuration
Summary of Contents for 7200 VXR Series
Page 8: ...Contents viii Cisco 7200 VXR Installation and Configuration Guide OL 5013 08 ...
Page 22: ......
Page 29: ...1 7 Cisco 7206VXR Overview Caution Note Cisco 7206VXR Overview Note ...
Page 32: ...1 10 Field Replaceable Units Caution Note Field Replaceable Units ...
Page 34: ...1 12 ...
Page 35: ...1 13 ...
Page 36: ...1 14 ...
Page 46: ......
Page 47: ...66420 U52 U42 U25 U11 NETWORK PROCESSING ENGINE 200 7 11 10 8 12 4 6 5 3 2 1 9 ...
Page 48: ......
Page 49: ...66416 NETWORK PROCESSING ENGINE 150 1 7 4 6 5 2 3 8 9 10 ...
Page 50: ......
Page 51: ...66424 U12 U4 U25 U18 NETWORK PROCESSING ENGINE 150 7 10 9 11 4 6 5 3 2 1 8 ...
Page 52: ...66433 U12 U4 U25 U18 NETWORK PROCESSING ENGINE 100 6 9 8 10 3 5 4 2 1 7 ...
Page 71: ......
Page 73: ......
Page 79: ...Router show interface fastethernet 5 0 ...
Page 80: ...1 2 3 ...
Page 85: ...show environment last show environment last show environment table ...
Page 103: ...Typical Four Post Equipment Rack Posts and Mounting Strips 84516 1 3 2 4 5 ...
Page 151: ...yes yes yes Your IGRP autonomous system number 1 15 router barney betty fred ...
Page 156: ...Configuring Synchronous Serial Interfaces Step 1 1 1 1 30 yes yes yes ...
Page 166: ...Performing Complex Configurations Performing Complex Configurations ...
Page 173: ...5 7 ...
Page 174: ...5 8 Troubleshooting the NPE G1 or NPE G2 ...
Page 177: ...A 1 A P P E N D I X A Bit No Hex Meaning ...
Page 179: ...Bit 6 Bit 7 Action File Name Bit 3 Bit 2 Bit 1 Bit 0 ...
Page 184: ......
Page 185: ...IN 1 I N D E X A B C ...
Page 186: ...IN 2 ...
Page 187: ...IN 3 D E F G ...
Page 188: ...IN 4 H I J L ...
Page 189: ...IN 5 M N O ...
Page 190: ...IN 6 P ...
Page 191: ...IN 7 R S ...
Page 192: ...IN 8 T U V W ...