
2-33
Catalyst 2900 Series XL Hardware Installation Guide
78-6461-04
Chapter 2 Installation
Connecting to DC Power
Figure 2-25 Torquing the Terminal-Block Captive Screws
Step 6
Repeat Steps 4 and 5 for the remaining three DC-input power source wires.
Figure 2-26
shows the completed wiring of a terminal block plug.
60533
Torque to 4.5 lbf-in. (72 ozf-in.)