System Startup
Turn each system power switch to the ON position.
•
Check that the blower modules are operating by listening for them.
•
As the GRP boots, observe the GRP alphanumeric LED displays.
•
As the line cards boot, observe the alphanumeric LED indicators on each line card. Line cards boot from
left to right.
•
Boot the Cisco IOS software image you want to use by entering the appropriate b command at the ROM
monitor prompt (>).
•
Proceed with the setup facility or exit from setup and use configuration commands to configure global and
interface−specific parameters.
•
Cisco 12008 GSR: Installation
Upper Card Cage: Removing Cards
Attach an antistatic ESD wrist strap to your wrist.
•
Insert the banana jack into the ESD connection socket.
•
Write down each card type and card location.
•
Loosen the captive screws.
•
Pivot the two card ejector levers away from the faceplate to unseat the card.
•
Slide the card out of its slot.
•
Stack the removed card on an antistatic mat for ESD protection.
•
Power Supply: Removing
Set the power to the off position.
•
Turn the captive screw on the power supply faceplate.
•
Pull the power supply unit halfway out of its bay.
•
Pull the power supply unit out completely.
•
Set the power supply unit aside in a safe place.
•
Catalyst 3000 and 5000 Router Modules
Catalyst 3000 Router: Installation
20614 Cisco Installing and Maintaining Routers Part 4: 12000 GSR Series and XS5032 Modules
6