background image

TO ORDER CALL US ON 

1800 012 681

1.  Dig a 150mm by 150mm trench both up-slope and down-slope of the area the matting is to be 

applied. Prepare the slope soil surface (raking, seeding and fertilising).

2.  Begin by placing the blanket a minimum of 300mm down-slope of the up-slope trench. Secure 

the blanket at the bottom of the trench with staples placed 300mm apart. Backfill and compact 

the trench. Apply seed, and fold the blanket over soil, secure with a row of staples placed 300mm 

apart across the width of the blanket (See Diagram A).

3.  Roll the blanket vertically down the slope. Secure using the appropriate staple pattern below, 

specified by slope (See staple patterns).

4.  Parallel blankets must be overlapped by a minimum of 100mm and secured with a row of staples 

approximately 1m apart (See Diagram B).

5.  Additional vertical blankets can be joined using a minimum 100mm overlapping or shingle 

style (See diagrams C) in the direction of the water flow. Connect the blankets by placing staples 

approximately 300mm apart across the width of the blankets.

6.  For maximum performance a check slot should be placed at 8m-12m intervals. Place a row of 

staples 100mm apart along the entire width of the slope. A second row should be placed 100mm 

below in a staggered pattern. Then continue with general installation (See diagrams D).

7.  The end of blanket must be secured in a 150mm by 150mm trench with a row of staples placed at 

300mm intervals (Diagram E).

SLOPE 

INSTALLATION

DETAIL

F

LOW

D

F

DIAGRAM

DIAGRAM

B

A

D

C

D

These guidelines are 

recommendations only.

Installations on steep slopes will 
require the correct safety gear.

WARNING

Summary of Contents for T-RECS

Page 1: ...T RECS INSTALLATION GUIDELINES EROSION PROTECTION APPLICATIONS 1800 012 681 WWW CIRTEX COM AU ISO G 062 002 DATE MAY 2020 VERSION 2 ...

Page 2: ...erlapping Diagram B and securing each blanket in the beginning trench Diagram A 5 Additional horizontal blankets can be joined using a minimum 100mm overlapping or shingle style in the direction of water flow Connect the blankets by placing staples approximately 100mm apart across the width of the blankets Diagram C 6 For maximum performance a check slot should be placed at 8m 12m intervals Place ...

Page 3: ...a minimum of 100mm and secured with a row of staples approximately 1m apart See Diagram B 5 Additional vertical blankets can be joined using a minimum 100mm overlapping or shingle style See diagrams C in the direction of the water flow Connect the blankets by placing staples approximately 300mm apart across the width of the blankets 6 For maximum performance a check slot should be placed at 8m 12m...

Page 4: ...O BE PLACED 300mm ON CENTRE STAPLESTO BE PLACED 300mm ON CENTRE 300mm MINIMUM OVERLAP COMPACTED BACKFILL T RECS MATTING UP SLOPE TRENCH INSTALLATION DETAIL STEP 1 STEP 2 STAPLESTO BE PLACED 30 48cm ON CENTRE 1 46 staple m2 2 1 SLOPES 914mm 610mm 1 22m 0 58 staple m2 4 1 SLOPES 914mm 914mm 1 83m 3 2 staple m2 1 1 SLOPES 254mm 508mm 1 22m 2 93 staple m2 MED to HIGH FLOW CHANNELS 508mm 610mm 1 22m 3 ...

Page 5: ... errors or omissions or for any consequences of reliance on this catalogue The information presented herein is intended only as a general guide to the use of such products and no responsibility or liability is accepted by Cirtex for any loss or damage however arising which results either directly or indirectly from use of such information Cirtex has a policy of continuous development therefore inf...

Reviews: