ECC3
INSTALLATION GUIDELINES
EROSION PROTECTION APPLICATIONS
0800 247 839
|
WWW.CIRTEX.CO.NZ
ISO: G 038 001 | DATE: MAY 2020 | VERSION 2
Page 1: ...ECC3 INSTALLATION GUIDELINES EROSION PROTECTION APPLICATIONS 0800 247 839 WWW CIRTEX CO NZ ISO G 038 001 DATE MAY 2020 VERSION 2...
Page 2: ...erlapping Diagram B and securing each blanket in the beginning trench Diagram A 5 Additional horizontal blankets can be joined using a minimum 100mm overlapping or shingle style in the direction of wa...
Page 3: ...y a minimum of 100mm and secured with a row of staples approximately 1m apart See Diagram B 5 Additional vertical blankets can be joined using a minimum 100mm overlapping or shingle style See diagrams...
Page 4: ...E PLACED 300mm ON CENTRE STAPLESTO BE PLACED 300mm ON CENTRE 300mm MINIMUM OVERLAP COMPACTED BACKFILL ECC3 MATTING UP SLOPE TRENCH INSTALLATION DETAIL STEP 1 STEP 2 STAPLESTO BE PLACED 30 48cm ON CENT...
Page 5: ...the company and is given out in good faith The information presented herein is intended only as a general guide to the use of such products and no liability is accepted by Cirtex Industries Ltd for a...