Application notes

 

1.- INTRODUCTION 

 
DELTA offers several inverter models that can be managed via the 

CDP 

Dynamic power controller.

 

 
For the 

CDP 

controller to be able to correctly manage the inverter, 

communication between the two devices must be correct and both products 
must be correctly programmed.  
 

 

These application notes are not meant as a substitute for the 

CDP 

or 

inverter manuals, but rather as additional support for individuals who 
need to interconnect the two devices.  

 
Even so, the guides and manuals of each product should be consulted and each 
company is responsible for providing technical support. 
 
An inverter from the 

PRI

  family of inverters will be used as a model in these 

application notes. 
 
 

2.- DELTA PRI M8A 8kW INVERTER 

 

The 

CDP

 and the inverter communicate via an RS-485 bus. This RS-485 bus 

can connect up to 100 inverters, although the number of inverters in the vast 
majority of domestic installations ranges from 1 to 3.

 

 
 

2.1.- COMMUNICATION CABLE 

 

Functions of the communication cable terminals between the 

CDP

 and the 

inverter: 

Table 2: Functions of the communication cable terminals

.

 

CDP 

R2 channel communications 

connector 

INVERTER 

Inverter ComCard  

connector  

Terminal 

Description 

Terminal 

Description 

1  

A+ 

DATA + 

3  

B- 

DATA - 

 

 

 

 
 

Summary of Contents for CDP series

Page 1: ...Connection and configuration of a CDP with DELTA RPI inverters APPLICATION NOTES M028E0901 03 15A...

Page 2: ...CDP 2 Application notes...

Page 3: ...lead to the risk of fire Carefully read the manual prior to connecting the unit Follow all installation and maintenance instructions throughout the unit s working life Pay special attention to the in...

Page 4: ...8A 8KW INVERTER 6 2 1 COMMUNICATION CABLE 6 2 1 1 CONNECTION OF ONE INVERTER 7 2 1 2 CONNECTION OF SEVERAL INVERTERS 7 2 2 INVERTER COMMUNICATION CONFIGURATION 8 3 CDP CONFIGURATION 9 4 COMMUNICATIONS...

Page 5: ...5 LOG OF REVISIONS Table 1 Log of revisions Date Revision Description 08 15 M028E0901 03 15A Original version Note The images of the units are solely for the purpose of illustration and may differ fr...

Page 6: ...roduct should be consulted and each company is responsible for providing technical support An inverter from the PRI family of inverters will be used as a model in these application notes 2 DELTA PRI M...

Page 7: ...rter terminals 2 1 1 CONNECTION OF ONE INVERTER Figure 2 shows the connection between the CDP and a single inverter Figure 2 Connection between a CDP and one inverter 2 1 2 CONNECTION OF SEVERAL INVER...

Page 8: ...with the CDP The AC and DC sides of the inverter must be connected to the mains before it can turn on Consult the inverter manual if you have any doubts The configuration of the DELTA inverter paramet...

Page 9: ...r the Install settings menu must enter a password 5555 Consult the manual for more information on how to configure the parameters 3 CDP CONFIGURATION There is a configuration web site for the CDP wher...

Page 10: ...the CDP so that the same regulation percentage is sent to each one When working with single phase inverters in three phase installations the total power of all the inverters must be programmed by sel...

Page 11: ...means the CDP is not communicating with the inverter In this case check the communication cables and the inverter communication configuration Correct communication between the CDP and the inverters co...

Page 12: ...a 3000W inverter generating 1400W Now we program the CDP indicating that the inverter power is 6000W The CDP will send the inverter a new setpoint so it can change its MPPT and the inverter will redu...

Page 13: ...d if the unit has been improperly used or the storage installation and maintenance instructions listed in this manual have not been followed Improper usage is defined as any operating or storage condi...

Page 14: ...CIRCUTOR SA Vial Sant Jordi s n 08232 Viladecavalls Barcelona Tel 34 93 745 29 00 Fax 34 93 745 29 14 www circutor es central circutor es...

Reviews: