CIG ONT M-97RG2 Hardware Installation Manual Download Page 3

M-97RG2 Hardware Installation Manual 

 
 

 

Table of Contents

 

 

Preface

 .............................................................................................................................................. 4

 

1.1.

 Basic Requirements

 ......................................................................................................................... 5

 

1.2.

 Environmental Requirements

 ........................................................................................................ 5

 

1.3.

 Electrical Safety

 ................................................................................................................................. 6

 

1.4.

 Instructions for Cleaning

 ................................................................................................................. 6

 

1.5.

 Other Instructions

 ............................................................................................................................. 6

 

1.6.

 Instructions for Environment Protection

 .................................................................................... 7

 

2. Product Description

 .................................................................................................................. 7

 

2.1.

 Introduction

 ........................................................................................................................................ 7

 

2.2.

 Services

 ............................................................................................................................................... 8

 

2.2.1. Data

 ................................................................................................................................................................ 8

 

2.2.2. Video

 .............................................................................................................................................................. 9

 

2.3.

 Specifications

 ..................................................................................................................................... 9

 

3. Hardware Operation

 ................................................................................................................ 10

 

3.1.

 Environmental Requirements

 ...................................................................................................... 10

 

3.2.

 Power Requirements

 ...................................................................................................................... 10

 

3.3.

 Mountings the Gateway

 ................................................................................................................. 10

 

3.4. Uninstall the Gateway

 .................................................................................................................... 11

 

4. Services enabled

 ...................................................................................................................... 11

 

4.1.

 Connecting Power

 ........................................................................................................................... 11

 

4.2.

 Connecting Ethernet Interface

 ..................................................................................................... 11

 

5. Verify the Installation and Services

 .................................................................................... 12

 

5.1.

 Verify the Installation

 ...................................................................................................................... 12

 

5.2.

 Activating the Gateway

 .................................................................................................................. 12

 

5.3.

 Verifying Services

 ........................................................................................................................... 13

 

6. Troubleshooting

 ....................................................................................................................... 13

 

6.1. Gateway Status LEDs

 .................................................................................................................... 13

 

6.2.

 Troubleshooting Procedures

 ....................................................................................................... 14

 

Appendix C: Ordering

 ................................................................................................................. 19

 

Summary of Contents for ONT M-97RG2

Page 1: ...M 97RG2 Hardware Installation Manual ONT M 97RG2 Hardware Installation Manual Mar 2021 Rev 2...

Page 2: ...pecifications products and products names are subject to change without notice Performance figures and data quoted in this document are typical and must be specifically confirmed in writing by CIG bef...

Page 3: ...2 2 1 Data 8 2 2 2 Video 9 2 3 Specifications 9 3 Hardware Operation 10 3 1 Environmental Requirements 10 3 2 Power Requirements 10 3 3 Mountings the Gateway 10 3 4 Uninstall the Gateway 11 4 Service...

Page 4: ...y Connecting the Gateway to the MoCa2 5 network Auto negotiation and MDI MDIX auto sensing Built in layer 2 switch Advanced data features such as VLAN tag manipulation classification and filtering The...

Page 5: ...ice without authorization Abide by local laws and regulations and respect the legal rights of others when using the device 1 2 Environmental Requirements Install the device in a well ventilated place...

Page 6: ...may become damaged Damaged cables can cause a device failure Do not use cables that are damaged or have deteriorated 1 4 Instructions for Cleaning Before cleaning the device stop operation of the dev...

Page 7: ...ng as well as all the safety instructions outlined in this manual when using this product Once this product is installed and used it is the responsibility of the user to know and understand how to saf...

Page 8: ...LAN1 LAN2 LAN3 LAN4 RJ 45 10 100 1000 Base T Ethernet Interface or 10 100 fast Ethernet Interface connecting to PC or Set Top Box MoCa2 5 Connection established with MOCA client ON OFF Power switch on...

Page 9: ...e port and then selectively delivers the multicast streams 2 3 Specifications Gateway physical electrical MoCa2 5 and environmental specifications and compliance information are listed in the followin...

Page 10: ...ther disasters 3 3 Mountings the Gateway The device supports two installation methods Installed on the wall and installed on the desktop Installing the Gateway on the Wall 1 Locate a safe and accessib...

Page 11: ...ut of electricity cable into a live AC outlet 3 Verify that the power PWR LED on the Gateway is lit green indicating that local power is on and voltage is good 4 2 Connecting Ethernet Interface 1 Loca...

Page 12: ...sioned in the network If services must be verified at the time of installation refer to Section for additional instructions 5 2 Activating the Gateway Once the Gateway installation is complete follow...

Page 13: ...3 Verifying Services Follow local practices to connect to each active service port in the Gateway to confirm service activation 1 If Ethernet service is included in this installation confirm that dat...

Page 14: ...and transfer Off Not active 6 MOCA Green Solid Connection established with MOCA client with no traffic running Green Flash Slow Establishing connection with MOCA client Green Flashing Fast Connection...

Page 15: ...the WLAN service is started This device complies with part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference 2 This device must...

Page 16: ...used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co located or operating in conjunction with any other antenna or transmi...

Page 17: ...ibility EMC Part 4 testing and measurement techniques section 2 electrostatic discharge immunity test EN 61000 4 3 2006 A1 2008 Electromagnetic Compatibility EMC Part 4 testing and measurement techniq...

Page 18: ...ours a day 7 days a week To contact the CIG technical assistance center use one of the following methods Telephone 400 157 7899 Email support cambridgeig com When you contact CIG please have the follo...

Page 19: ...ts contact your local sales representative or contact CIG at the address telephone fax number or e mail address Address 5 F Building 8 2388 ChenHang Road MinHang District Shanghai 201114 China Phone 8...

Reviews: