Notes:
(1) Before closing ceiling decoration, it is necessary to turn on the machine to check air flow
at each port, noise level, connecting pipeline leakage, cooling (heating) effect, air duct
insulation and condensate pipe drainage etc. Close ceiling only when acceptance is OK.
(2) In case of no cooling (heating) effect, first check power supply phase sequence. Z6
protection display is provided on FR(D)125/S display panel.
(3) Installation team shall timely coordinate with decoration team to avoid change of position
and installation mode of installed indoor unit, keep indoor unit & condensate pipe clean, and
reserve maintenance openings for future maintenance.
V. Installation of LCD wire controller (for FRD23-B, FRD35-B and FRD50-B)
Refer to following figure for installation mode of LCD wire controller. Install junction box at
a position in the wall easy to operate. Lead in signal line via wall-penetrating tube. Remove
bottom of wire controller box, use tapping screws to fit it on the junction box. Then fit the
wire controller on the bottom piece.
Strainer retaining strip
Return air duct fixing holes
Wire controller
Tapping screws
Wire controller
bottom piece
Junction box
Summary of Contents for -B
Page 38: ...Main technical parameters 36 3 Value in is nominal value for auxiliary electric heating...
Page 43: ...Circuit diagrams 41 Chapter V Circuit diagrams I Circuit diagrams...
Page 44: ...Circuit diagrams 42...
Page 45: ...Circuit diagrams 43...
Page 46: ...Circuit diagrams 44...
Page 47: ...Circuit diagrams 45...
Page 48: ...Circuit diagrams 46...
Page 49: ...Circuit diagrams 47...
Page 50: ...Circuit diagrams 48...
Page 51: ...Circuit diagrams 49...
Page 52: ...Circuit diagrams 50...
Page 53: ...Circuit diagrams 51...
Page 54: ...Circuit diagrams 52...
Page 55: ...Circuit diagrams 53...
Page 56: ...Circuit diagrams 54...