![CHUANDA 2008c Owner'S Manual Download Page 14](http://html1.mh-extra.com/html/chuanda/2008c/2008c_owners-manual_2606286014.webp)
PART II CABLE GUIDELINES
Step 6. CABLE MAPPING DIAGRAM (FIG. 6)
INSTALL THE CABLE A
Attach the Cable A to the opening at the front of the Pulley (58). Note: 1)The Ball Stopper on the cable
should be underneath the Upper Frame (6). As FIG 6 shown
Attach the Pulley (58) to the Upper Frame (6) with Hexagon Head Bolt M10x45 (31), M10 Nylon Nut
(42), and
φ
10 Washers (38-2pcs).
2) Draw the Cable A towards the back of the machine to the open bracket on the Main Support Tube (3).
Attach the Pulley (58) to the Main Support Tube (3) with one M10x65 Hexagon Head Bolt (30), M10
Nylon Nut (42), and
φ
10 Washers (38-2pcs).
13
FIG.6
Summary of Contents for 2008c
Page 4: ...OVERVIEW DRAWING 3...