4 . I N S T A L L A T I O N
P R O C E D U R E S
4.1. U
N P A C K I N G
Follow these instructions if the unit is crated.
Christie recommends that the unit be moved to the installation site before
uncrating.
1. Be sure container is upright.
2. Open crate and remove packing.
3. Carefully remove unit from crate.
4. Thoroughly inspect unpacked unit for damage that may have occurred during shipping.
Any damage discovered should be reported to the transportation company at
once for inspection and filing of claim.
4.2. I
N S T A L L A T I O N
Place console in intended operating location in projection booth.
4 . 2 . 1 . L
E V E L I N G
F
E E T
Install four (4) leveling feet by screwing one into each of the four corners underneath base
until about 1/2 inch of thread remains exposed. (See Item 8 in Figure 4-1.)
Christie recommends carefully
tilting the console to one side to install the
first two feet, then tilting it to the other side to install the other two feet.
An assistant is required to do this safely.
Summary of Contents for SLC 20
Page 6: ......
Page 12: ......
Page 14: ......
Page 24: ......
Page 30: ...SLC Series Xenon Console 6 6 CHRISTIE DIGITAL SYSTEMS August 7 2003 ...
Page 40: ...SLC Series Xenon Console W 2 CHRISTIE DIGITAL SYSTEMS August 7 2003 ...
Page 54: ...SLC Series Xenon Console A 14 CHRISTIE DIGITAL SYSTEMS August 7 2003 Figure A 7 Power Supply ...
Page 56: ......
Page 60: ......
Page 61: ......