Operation
D4K2560 Setup Guide
29
020-101171-04 Rev. 1 (01-2015)
LED expected behavior on power up
The following table shows the expected behavior of the projector LED and the MCPU board power
LED on power up:
At approximately one minute and 15 seconds, the TPC indicates that it is connected and shows the
home page.
Turn the projector off
1. On the touch panel controller, tap the
Home
tab.
2. Tap
Power
.
Action/Event
Projector LEDs
MCPU Board Power LED
Applying AC power to the projector head
Solid red
Solid green
Solid yellow
Yellow
Within the first second
Solid red
Solid green
Solid yellow
Blinking green
At approximately 30 seconds
Off red
Blinking yellow
Blinking green
Blinking green
At approximately 50 seconds
Off/blinking red
Solid yellow
Off green
Solid green
i
When powering off in preparation for inspection or maintenance, always disconnect from AC
and set the projector breaker to the off positions.