
Installation
Valego® RDE-58 with Flat Roof Instruction Manual
34
Full Section Walkover
1.Expulsion Shafts should be 3" past Side Panels.
Note:
Walkover Frame Covers, Egg Belt Covers, and Closures are installed the same for Full or Half Section
Walkovers
through
. for better view of parts.
2.Install Walkover Frame Covers
(Item 1)
.
3.Install Walkover Egg Belt Covers
(Item 2)
.
4.Install Walkover Closures
(Item 3)
.
5.Install Expulsion Shaft Caps
(Item 5)
.
Expeller Installation
Expeller Panel Assembly
1.Install two Panel Lock Bushings
(Item 1)
per Expeller Panel
(Item 2)
.
2.Attach three Panel Clamps
(Item 3)
per Panel in the locations
shown.
Figure 42.Full Section Walkover
3" [7.6 cm]
Item
Description
Part No.
1
Walkover Frame Cover
600812
2
Walkover Egg Belt Cover
600800
3
Walkover Closure
600923
4
15mm Connecting Pin
600732
5
Expulsion Shaft Cap
201038
1
2
4
4
3
5
Item
Description
Part No.
1
Expulsion Panel Lock Bushing
600789
2
Expeller Panel
600424
3
Expulsion Panel Clamp
600795
Figure 43.Assembling Expeller Panel
1
3
2