![Chore-Time Turbo-Cool Installation & Operator'S Instruction Manual Download Page 19](http://html1.mh-extra.com/html/chore-time/turbo-cool/turbo-cool_installation-and-operators-instruction-manual_2603221019.webp)
Turbo-Cool 6” Recirculating Evaporative Cooling System Manual
19
Figure 14. Pad Orientation (cut-away view of side of Pad)
2. Set the Covers on the Pipe Hangers, as shown in
Figure 15
, Step 1.
3. Slide the Cover Locks onto the Pipe Hangers, as shown in
Figure 15
, Step 2.
4. Repeat steps 1-3 until all the Evaporative Cooling Pads are installed. The
Covers should butt end to end.
5. The Evaporative Cooling Pads may be trimmed as required using a handsaw,
to fit inside the End Panels.
Figure 15. Cover and Cover Lock Installation
Item
Description
1
Cover
2
Distribution Pipe
3
Evaporative Cooling Pad
4
Cover Lock
Step 1
Step 2