Linear Lift
TM
800
Installation
Linear LiftTM 800
Installation
Linear LiftTM 800 Assembly
10
MV1654F
The Linear Lift
TM
800 may be mounted to the wall or ceiling, using (8) 3/8" Lag
Screws (included in the Hardware Package).
See Figure 8.
1. Route the cable as required to the main curtain or baffle board cable.
2. Mount the Linear Lift
TM
800 to the wall or ceiling using the hardware provided.
See note below.
Item Description
1
Cable Routing
2
Linear Lift
TM
800
3
Mounting Hole Locations
Figure 8. Linear Lift
TM
800 Installation (vertical wall view)
Grease Recommendation
The LINEAR–LIFT
TM
is fully greased at the factory. However, for maximum life,
Chore-Time strongly recommends greasing the Linear Lift
TM
800 at each grease fitting
monthly. For best results apply grease through grease fitting while Linear Lift
TM
800
is in operation to put an even coating of grease over the entire length of the Threaded
Shaft.
Recommended Grease: Sunoco Construction Grease or Mobile CMP Grease
(available through Grainger) or similar water-resistant with moly, extreme pressure
(E.P.) grease.
See Figure 9.
IMPORTANT:
Grease monthly for maximum life.
Figure 9. Linear Lift
TM
800 Critical Grease Fitting Locations (horizontal wall mount view)
Item Description
1
Machined Nut
2
Grease Fitting