lifting process. 

b)  Firstly,  tear the  stretch film,  then  move  away  the  top  cover  after  cutting  off  each  module 

packing strip while unpacking.   

c)  Two operators work as a group, if the modules are fixed with anti-inverted tapes, grasp the 

module frame tightly in the same direction and take out the module one by one. It is a must 

that the operators remove the adhesive tape of the fixed module one by one, rive one piece 

and then take out one piece of module. If the modules are fixed with packing belt, firstly cut 

the  two  packing  belt,  use  non-sharp  and  dependable  items  such  as  anti-falling  sticks  to 

hold  one  side  of  the  long  side  carton,  and  then  cut  the  other  side  of  the  carton,  two 

operators take out the module one by one. We don’t allow to tear off all the adhesive tape 

at one time in to prevent the whole package from toppling over or falling down. The whole 

process must be taken very gently. Don’t collide with any hard objects or let any parts of 

the frame touch and drag on the ground. 

d)  After  unpacking  the  modules  should  be  installed  that  day  as  far  as  possible. 

It’s 

recommended to take the right amount of modules according to the progress of the project 

every  day.  Heavy  rain  and  other  inclement  weather  may  have  the  potential  to  soak  the 

packaging  which  can  affect  product  reliability,  such  as  storms,  typhoons,  hurricanes  or 

other events in which they may be blown away. If the users need to store modules before 

installation, do not open the package, the goods should be stored in a room temperature, 

dark, dry and ventilated place. 

3.2.2 Module

’s Stack 

a)  When  a  module  is  taken  out  of  the  box,  cardboard  bedding  below  should  be  applied  in 

order to avoid contact with cement surface / ground, hard metal or tile. Modules should be 

placed neatly and should not be dropped, slammed or scratched. 

b)  When stacking modules,  it needs to  be  stacked neatly in  the horizontal plane,  under the 

condition of the glass facing down and the back way piled up, while the cardboard bedding 

need  to  be  underside  the  modules.  If  the  modules  will  be  installed  on  the  rooftop,  the 

number  of  each  stack  is  suggested  no  more  than  20.  In  case  of  the  poor  load-bearing 

capacity,  it’s  recommended  that  the  designer  and/or  installer  check  with  the  structural 

engineer or architect to determine the amount of load allowable for specific location. During 

Summary of Contents for Astronergy CHSM60LV-HC

Page 1: ...icon PV Module Installation Manual 1 Introduction 1 1 Purpose 1 2 Limitation of Liability 2 Codes and Regulations 3 Safety 3 1 General Safety 3 2 Installation Precautions 3 3 Installation Safety 4 Mechanical Installation 4 1 Installation Condition 4 2 Tilt Angle Selection 4 3 Installation Methods 5 Electrical Installation 5 1 Installation Condition 5 2 Grounding 6 Maintenance ...

Page 2: ...on operation use and maintenance of photovoltaic PV products are beyond Chint Solar s control Chint Solar does not afford the responsibility and expressly disclaims liability for loss damage or expense arising out of or in any way connected with such installation operation use or maintenance Chint Solar reserves the right to change the manual without prior notice 2 Codes and Regulations The mechan...

Page 3: ...with chemicals 3 1 7 Do not drop the PV module or drop objects onto the PV module 3 1 8 Do not concentrate sunlight on the modules or panels 3 1 9 Do not attempt to disassemble the modules and do not remove any attached components from the modules 3 1 10 Do not scratch or hit at the back sheet the glass the terminal box Do not pull the cables or touch them with bare hands 3 1 11 Do not drill holes...

Page 4: ... the ground d After unpacking the modules should be installed that day as far as possible It s recommended to take the right amount of modules according to the progress of the project every day Heavy rain and other inclement weather may have the potential to soak the packaging which can affect product reliability such as storms typhoons hurricanes or other events in which they may be blown away If...

Page 5: ...ame row or the same square have the same color according to the system design requirements e Due to the complexity and difference of the construction site these precautions may not cover all items please refer to the specific construction standards 3 3 Installation Safety 3 3 1 Wear protective clothing such as head gear insulating gloves safety shoes as prescribed by local safety codes Use insulat...

Page 6: ...ng on the solar PV module is forbidden and also prohibit installation tools or other objects hitting surface of the solar PV module 3 3 18 The solar modules are recommended to be installed over a fireproof and insulating roof covering when installed on a roof 3 3 19 PV cable connection cannot be too tight it is recommended that the connector and the backsheet have a certain gap 3 3 20 In sandy reg...

Page 7: ...olar modules are designed to meet the requirements of IEC61730 and UL 61730 application the fire performance Class C IEC61730 and type 4 UL61730 4 1 8 Observe the linear thermal expansion of the modules frames must ensure that the minimum distance between neighboring frames is 10mm 4 2 Tilt Angle Selection The tilt angle of the modules is measured between the surface of modules and a horizontal gr...

Page 8: ...he mounting holes All modules must be securely fastened with at least 4 bolts As shown in Figure b Figure c Figure d and Figure e Fig b Bolt installation for 60cell Fig c Outer four hole bolt installation for 72cell Fig d Internal four hole bolt installation for 72cell Fig e 400mm pitch bolt installation for 72cell Remark In order to achieve maximum safety precautions against wind and snow loads i...

Page 9: ...w on either a stainless steel spring washer or a toothed lock washer Finally secure with a stainless steel nut d The reference value of tightening torques should be within 9 12Nm 17 23 Nm respectively for M6 M8 bolts depending on bolt class For the bolt grade the technical guideline from the fastener suppliers should be followed For the torque value recommendations from specific clamping hardware ...

Page 10: ...h an anti corrosion process e g hot dipped galvanizing Each PV module needs at least four clamps to fix Do not make the clamp contact the glass directly or make the aluminum frame deformation in the installation process and avoid the shadow of solar PV modules otherwise may break the modules b Be sure to avoid shadowing effects from the module clamps Weep holes on the module frame must not be clos...

Page 11: ...llation methods are used the Chint Solar limited warranty will be invalid Figure k 4 3 3 Component installation range and Mechanical load value The specific Mechanical load value and installation scope of Chint Solar PV modules are shown in the following table Module type Dimensions L W H mm Installation method Fig b Fig C Fig d Fig g Fig h Fig e CHSM6610M CHSM6610M HV CHSM6610P CHSM6610P HV CHSM6...

Page 12: ...tallation scope 400 50mm 1800 1800Pa Installation scope 200 50mm CHSM6612M CHSM6612M HV CHSM6612P CHSM6612P HV 1954 990 40 1954 990 35 5400Pa 2400Pa 5400Pa 2400Pa 5400 2400Pa Installation scope 299 498mm 2400Pa 2400Pa 1960 992 40 1960 992 35 5400Pa 2400Pa 5400Pa 2400Pa 5400 2400Pa Installation scope 299 498mm 2400Pa 2400Pa CHSM72M HC CHSM72P HC CHSM72M LV HC 1986 992 40 1986 992 35 5400Pa 2400Pa 5...

Page 13: ...ient temperature for the location This can be done using the following formula Max System voltage N Voc 1 TCvoc x Tmin 25 N No modules in series Voc Open circuit voltage of each module refer to product label or data sheet Tcvoc Thermal coefficient of open circuit voltage for the module refer to data sheet Tmin The lowest ambient temperature 5 1 3 Connect quantity of modules that match the voltage ...

Page 14: ...t exposure and water immersion of the cables 5 1 10 The junction boxes used with Chint Solar modules contain bypass diodes wired in parallel with the PV cell string The bypass diode in the junction box can avoid the degradation of component performance caused by shading or covering such as aging of packaging materials sealing off etc please refer to the junction box diode specifications provided i...

Page 15: ...ods to ground modules properly Figure i Grounding the aluminum frame with copper wire a The grounding requirements must be checked in accordance with the applicable regulations and standards before work is started b Use the marked 5 5 mm grounding holes to ground the anodized frame Use one M5 nut two M5 cut washers one M5 plain washer one M5 spring washer and one M5 bolt and the copper wire All nu...

Page 16: ...he modules especially within warranty scope It is the user s responsibility to the report to the supplier regarding the damages found in time 6 1 Regularly carry out a visual inspection for dirt dust bird dropping leaves and other detritus covering the modules 6 2 If snow is present a soft bristled brush with soft bristles may be used to clean the surface of the modules 6 3 Regular electrical and ...

Page 17: ...le 6 6 2 Cleaning after sunset or before sunrise is recommended for safety of O M operator shock from heat stroke 6 6 3 Do not use abrasive powder abrasive cleaners scrubber cleaners polishers sodium hydroxide benzene nitro thinners acid or alkali and other chemical substances 6 6 4 Do not clean broken glass or modules with broken lines or exposed wires as it may cause the electric shock CHINT SOL...