lifting process.
b) Firstly, tear the stretch film, then move away the top cover after cutting off each module
packing strip while unpacking.
c) Two operators work as a group, if the modules are fixed with anti-inverted tapes, grasp the
module frame tightly in the same direction and take out the module one by one. It is a must
that the operators remove the adhesive tape of the fixed module one by one, rive one piece
and then take out one piece of module. If the modules are fixed with packing belt, firstly cut
the two packing belt, use non-sharp and dependable items such as anti-falling sticks to
hold one side of the long side carton, and then cut the other side of the carton, two
operators take out the module one by one. We don’t allow to tear off all the adhesive tape
at one time in to prevent the whole package from toppling over or falling down. The whole
process must be taken very gently. Don’t collide with any hard objects or let any parts of
the frame touch and drag on the ground.
d) After unpacking the modules should be installed that day as far as possible.
It’s
recommended to take the right amount of modules according to the progress of the project
every day. Heavy rain and other inclement weather may have the potential to soak the
packaging which can affect product reliability, such as storms, typhoons, hurricanes or
other events in which they may be blown away. If the users need to store modules before
installation, do not open the package, the goods should be stored in a room temperature,
dark, dry and ventilated place.
3.2.2 Module
’s Stack
a) When a module is taken out of the box, cardboard bedding below should be applied in
order to avoid contact with cement surface / ground, hard metal or tile. Modules should be
placed neatly and should not be dropped, slammed or scratched.
b) When stacking modules, it needs to be stacked neatly in the horizontal plane, under the
condition of the glass facing down and the back way piled up, while the cardboard bedding
need to be underside the modules. If the modules will be installed on the rooftop, the
number of each stack is suggested no more than 20. In case of the poor load-bearing
capacity, it’s recommended that the designer and/or installer check with the structural
engineer or architect to determine the amount of load allowable for specific location. During