CHINT Astronergy CHSM60LV-HC Installation Manual Download Page 12

 

 

Chint Solar (Zhejiang) Co.,Ltd. | Add:1335 Bin´an Road, Binjiang District, Hangzhou | P.C: 310053 
Tel: 0086-571-5603 1888 | Fax: 086-571-5603 2316 | Website: http://energy.chint.com/

 

CHSM60M-HC 

CHSM60P-HC 

CHSM60M(BL)-HC 

CHSM60M/LV-HC 

1666*992*35 

+5400Pa 

-2400Pa 

--- 

+5400/-2400Pa 

Installation scope 

207~408mm 

+2400/-2400Pa 

Installation scope 

50~200mm 

--- 

1675*992*35 

+5400Pa 

-2400Pa 

--- 

+5400/-2400Pa 

Installation scope 

215~415mm 

+2400/-2400Pa 

Installation scope 

50~200mm 

--- 

1692*1002*35 

+5400Pa 

-2400Pa 

--- 

+5400/-2400Pa 

Installation scope 

350

±

50mm 

+2400/-2400Pa 

Installation scope 

50~200mm 

--- 

1765*1048*35 

+5400Pa 

-2400Pa 

--- 

+5400/-2400Pa 

Installation scope 

400

±

50mm 

+1800/-1800Pa 

Installation scope 

200

±

50mm 

--- 

CHSM6612M 

CHSM6612M/HV 

CHSM6612P 

CHSM6612P/HV

 

1954*990*40 

1954*990*35

 

+5400Pa 

-2400Pa 

+5400Pa 

-2400Pa 

+5400/-2400Pa 

Installation scope 

299~498mm 

--- 

+2400Pa 

-2400Pa 

1960*992*40 

1960*992*35

 

+5400Pa 

-2400Pa 

+5400Pa 

-2400Pa 

+5400/-2400Pa 

Installation scope 

299~498mm 

--- 

+2400Pa 

-2400Pa 

CHSM72M-HC 

CHSM72P-HC 

CHSM72M/LV-HC

 

1986*992*40 

1986*992*35

 

+5400Pa 

-2400Pa 

+5400Pa 

-2400Pa 

+5400/-2400Pa 

Installation scope 

315~505mm 

--- 

+2400Pa 

-2400Pa 

2000*992*40 

2000*992*35

 

+5400Pa 

-2400Pa 

+5400Pa 

-2400Pa 

+5400/-2400Pa 

Installation scope 

315~505mm 

--- 

+2400Pa 

-2400Pa 

2018*1002*40 

2018*1002*35

 

+5400Pa 

-2400Pa 

+2400Pa 

-2400Pa 

+5400/-2400Pa 

Installation scope 

350

±

50mm 

--- 

+2400Pa 

-2400Pa 

2108*1048*35

 

+5400Pa 

-2400Pa 

+2400Pa 

-2400Pa 

+5400/-2400Pa 

Installation scope 

400

±

50mm 

--- 

+2400Pa 

-1700Pa 

 

 

 

Summary of Contents for Astronergy CHSM60LV-HC

Page 1: ...icon PV Module Installation Manual 1 Introduction 1 1 Purpose 1 2 Limitation of Liability 2 Codes and Regulations 3 Safety 3 1 General Safety 3 2 Installation Precautions 3 3 Installation Safety 4 Mechanical Installation 4 1 Installation Condition 4 2 Tilt Angle Selection 4 3 Installation Methods 5 Electrical Installation 5 1 Installation Condition 5 2 Grounding 6 Maintenance ...

Page 2: ...on operation use and maintenance of photovoltaic PV products are beyond Chint Solar s control Chint Solar does not afford the responsibility and expressly disclaims liability for loss damage or expense arising out of or in any way connected with such installation operation use or maintenance Chint Solar reserves the right to change the manual without prior notice 2 Codes and Regulations The mechan...

Page 3: ...with chemicals 3 1 7 Do not drop the PV module or drop objects onto the PV module 3 1 8 Do not concentrate sunlight on the modules or panels 3 1 9 Do not attempt to disassemble the modules and do not remove any attached components from the modules 3 1 10 Do not scratch or hit at the back sheet the glass the terminal box Do not pull the cables or touch them with bare hands 3 1 11 Do not drill holes...

Page 4: ... the ground d After unpacking the modules should be installed that day as far as possible It s recommended to take the right amount of modules according to the progress of the project every day Heavy rain and other inclement weather may have the potential to soak the packaging which can affect product reliability such as storms typhoons hurricanes or other events in which they may be blown away If...

Page 5: ...ame row or the same square have the same color according to the system design requirements e Due to the complexity and difference of the construction site these precautions may not cover all items please refer to the specific construction standards 3 3 Installation Safety 3 3 1 Wear protective clothing such as head gear insulating gloves safety shoes as prescribed by local safety codes Use insulat...

Page 6: ...ng on the solar PV module is forbidden and also prohibit installation tools or other objects hitting surface of the solar PV module 3 3 18 The solar modules are recommended to be installed over a fireproof and insulating roof covering when installed on a roof 3 3 19 PV cable connection cannot be too tight it is recommended that the connector and the backsheet have a certain gap 3 3 20 In sandy reg...

Page 7: ...olar modules are designed to meet the requirements of IEC61730 and UL 61730 application the fire performance Class C IEC61730 and type 4 UL61730 4 1 8 Observe the linear thermal expansion of the modules frames must ensure that the minimum distance between neighboring frames is 10mm 4 2 Tilt Angle Selection The tilt angle of the modules is measured between the surface of modules and a horizontal gr...

Page 8: ...he mounting holes All modules must be securely fastened with at least 4 bolts As shown in Figure b Figure c Figure d and Figure e Fig b Bolt installation for 60cell Fig c Outer four hole bolt installation for 72cell Fig d Internal four hole bolt installation for 72cell Fig e 400mm pitch bolt installation for 72cell Remark In order to achieve maximum safety precautions against wind and snow loads i...

Page 9: ...w on either a stainless steel spring washer or a toothed lock washer Finally secure with a stainless steel nut d The reference value of tightening torques should be within 9 12Nm 17 23 Nm respectively for M6 M8 bolts depending on bolt class For the bolt grade the technical guideline from the fastener suppliers should be followed For the torque value recommendations from specific clamping hardware ...

Page 10: ...h an anti corrosion process e g hot dipped galvanizing Each PV module needs at least four clamps to fix Do not make the clamp contact the glass directly or make the aluminum frame deformation in the installation process and avoid the shadow of solar PV modules otherwise may break the modules b Be sure to avoid shadowing effects from the module clamps Weep holes on the module frame must not be clos...

Page 11: ...llation methods are used the Chint Solar limited warranty will be invalid Figure k 4 3 3 Component installation range and Mechanical load value The specific Mechanical load value and installation scope of Chint Solar PV modules are shown in the following table Module type Dimensions L W H mm Installation method Fig b Fig C Fig d Fig g Fig h Fig e CHSM6610M CHSM6610M HV CHSM6610P CHSM6610P HV CHSM6...

Page 12: ...tallation scope 400 50mm 1800 1800Pa Installation scope 200 50mm CHSM6612M CHSM6612M HV CHSM6612P CHSM6612P HV 1954 990 40 1954 990 35 5400Pa 2400Pa 5400Pa 2400Pa 5400 2400Pa Installation scope 299 498mm 2400Pa 2400Pa 1960 992 40 1960 992 35 5400Pa 2400Pa 5400Pa 2400Pa 5400 2400Pa Installation scope 299 498mm 2400Pa 2400Pa CHSM72M HC CHSM72P HC CHSM72M LV HC 1986 992 40 1986 992 35 5400Pa 2400Pa 5...

Page 13: ...ient temperature for the location This can be done using the following formula Max System voltage N Voc 1 TCvoc x Tmin 25 N No modules in series Voc Open circuit voltage of each module refer to product label or data sheet Tcvoc Thermal coefficient of open circuit voltage for the module refer to data sheet Tmin The lowest ambient temperature 5 1 3 Connect quantity of modules that match the voltage ...

Page 14: ...t exposure and water immersion of the cables 5 1 10 The junction boxes used with Chint Solar modules contain bypass diodes wired in parallel with the PV cell string The bypass diode in the junction box can avoid the degradation of component performance caused by shading or covering such as aging of packaging materials sealing off etc please refer to the junction box diode specifications provided i...

Page 15: ...ods to ground modules properly Figure i Grounding the aluminum frame with copper wire a The grounding requirements must be checked in accordance with the applicable regulations and standards before work is started b Use the marked 5 5 mm grounding holes to ground the anodized frame Use one M5 nut two M5 cut washers one M5 plain washer one M5 spring washer and one M5 bolt and the copper wire All nu...

Page 16: ...he modules especially within warranty scope It is the user s responsibility to the report to the supplier regarding the damages found in time 6 1 Regularly carry out a visual inspection for dirt dust bird dropping leaves and other detritus covering the modules 6 2 If snow is present a soft bristled brush with soft bristles may be used to clean the surface of the modules 6 3 Regular electrical and ...

Page 17: ...le 6 6 2 Cleaning after sunset or before sunrise is recommended for safety of O M operator shock from heat stroke 6 6 3 Do not use abrasive powder abrasive cleaners scrubber cleaners polishers sodium hydroxide benzene nitro thinners acid or alkali and other chemical substances 6 6 4 Do not clean broken glass or modules with broken lines or exposed wires as it may cause the electric shock CHINT SOL...

Reviews: