![Chinowing T40 User Manual Download Page 28](http://html.mh-extra.com/html/chinowing/t40/t40_user-manual_2602260028.webp)
www.chinowing.com
28
8. T40 GCS <Parameters Setting Software>
Operation
8.1 <Parameters Setting Software> Instruction
T40 <Parameters Setting Software>“CHINOWING”Version no.“V1.0”. Power on
GCS, open CHINOWING software, then enter the main interface as shown above.
8.2 Channel Monitoring and Calibration