Mount the Chinook 200 Turbine onto the Support Structure-
Ensure that the previously installed
power transmission wires are not yet connected to any batteries and are ‘shorted’ together. This will pre-
vent the turbine from operating during the installation process. Once this has been done, connect the tur-
bine output wires to the transmission wires using a terminal block with a minimum rating of 30 Amps.
Move the turbine up to the support structure and push the turbine body onto the tower. Ensure that no
wires are snagged. Use the M6 x 70 fully threaded screw, along with two washers and an Nylock nut to
secure the turbine to the tower mount using the hole in the yaw pivot. Ensure that the M6 set-screw is
securely fastened.
User Manual (Chinook 200) Rev D Final Page 12