Read Carefully before operating
1) Upon receipt of your new power console, visually inspect it for any damage that
might have occurred during shipment. If there are any signs of damage please
call EHS immediately so a damage claim can be processed.
2) The power console weighs approximately 960 pounds. Be very careful when
loading and unloading using a fork-lift.
3) Never operate the power console with the sides or the top removed. Serious
electrical shock can occur if care is not taken.
4) Always use a primary cable of #4 AWG minimum. Do not use anything smaller
in size. The cable must be 4-Wire and the power console must be grounded at all
times during use.
5) Make sure the primary input taps have been connected in the correct orientation
for the voltage you will be using i.e. 440/480/575 Volts.
6) Make sure the secondary taps have been connected in the correct orientation for
the heaters you will using i.e. 80 Volts.
7) If you should have any questions please call us 24 hours a day, 7 days a week, at
our office # (609) 588-0900.
Getting Started set up Procedure
1) Make sure that all primary power connections are tightened and properly connected.
Make sure that the unit is grounded and that the supply power is connected to the
correct input taps.
2) Connect the triple cable sets to the output camlocks. Make sure the corresponding
thermocouples (T/C) are plugged into the proper T/C jacks.
NOTE !!
When attaching the thermocouples to the work-piece or reattaching a broken
thermocouple, it is very important to temporarily disconnect the T/C from the jack on
the console and the jack on the recorder. The electrical spark of the TAU may travel
through the T/C wire and cause damage to the recorder or the controller.
3) Turn power on to the console.