mod.14-2015.03.04-09.25-002-ml.docx
GB
6
Install the gas springs on the uprights from both sides: tighten the self-locking nut, leaving the
spacers free to rotate (Fig. 2).
7
Place the platform in position for use.
8
Install the handrails with the hardware provided: tighten the self-locking nut thus allowing
smooth height adjustment (Fig.3).
Fig. 3
3.2 01327
1
Remove the equipment, ramps and hardware bags from the packaging
2
Lay aside the spare parts bags
[N]
and
[O]
and storage them in a suitable place for
possible future use
3
Open the hardware bag for the angle adjustment kit
[G]
and check that all the hardware
match with the quantities and types as shown in the following picture
[G1]
Screw M8x30
2 pcs
[G2]
Screw M8x40
2 pcs
[G3]
Nut caps m8
8 pcs
[G4]
Screw M8x90
2 pcs
[G5]
Screw M8x80
2 pcs
[G6]
Nut M8
6 pcs
[G7]
Dish washer
2 pcs
[G8]
Hex wrench 6
1 pc
[G9]
Spacer
8 pcs
If the hardware doesn’t match with the picture please contact our assistance service department
4
Follow the steps from 3) to 8) of the previous chapter
5
Tilt kit mounting:
a. Install the gas springs and the tilting kit as shown in fig.4. Note that the screws must be
free to rotate
[C5]
[C5]
[C6]
[C4]
[C8]
[G3]
[G8]
[G6]
[G5]
[G2]
[G1]
[G4]
[G7]
[G9]