3
Lightbank Cover
CAUTION: take extreme care in next step to not get front diffuser dirty by dragging on the floor or
ground. You can put clean material down over a dirty surface - tape it securely so it doesn’t move. Raise
your F2X frame off the ground at this stage, but not too high, approximately 2 feet, either on short light
stands or apple boxes, etc.
Spread the cover and attach the four corner straps. Then lift and attach the end panels. Cover panels
go inside top tube, over, and out and then Velcro’s to itself.
Start to lift and attach side panels to every other bay. Finish by going around up to three times to tighten
and smooth out the entire cover.
Top cover is spread over the top of the unit and attaches first to ends and again is stretched to flatten
and smooth out material.
Rigging
The last step is to rig your F2 Lightbank. Your options are:
1. on light stands
2. rope and pulley
3.
FOBA motorized systems – www.foba.com/eng/decken/decken.htm
Also see the assembly video in our video library:
www.chimeralighting.com
.