Chiko L-Foot Kit Installation Instructions Download Page 3

 L-Foot Kit

12”

9”

1” 5/8

3” 5/16

Aluminum L-Foot

3/8” x 3.5” SUS Screw 

with 3/8” EPDM washer

EPDM washer with adhesive

Aluminum Flashing

Install our Rail splice kits at all 

connections between two rails. 

(10 Ft Lb).

Insert the Mid Clamp nut by tilting it 

in the opening on the top of the rail.  

Fasten and install at all locations

where to modules meet (10 Ft Lb). 

Locations of mid clamps can be 

determined by panel manufacturer 

datasheet.

Insert End Clamp nut by tilting it in 

the opening on the top of the rail.  

Fasten at the end of each array 

(10 Ft Lb).

Install the Grounding Lug on each 

section of rail.  Run copper wire to 

connect them all.  

Tighten to 3 Ft Lb.

The system is complete.

Reviews: