
L-Foot Kit
12”
9”
1” 5/8
3” 5/16
Aluminum L-Foot
3/8” x 3.5” SUS Screw
with 3/8” EPDM washer
EPDM washer with adhesive
Aluminum Flashing
Install our Rail splice kits at all
connections between two rails.
(10 Ft Lb).
Insert the Mid Clamp nut by tilting it
in the opening on the top of the rail.
Fasten and install at all locations
where to modules meet (10 Ft Lb).
Locations of mid clamps can be
determined by panel manufacturer
datasheet.
Insert End Clamp nut by tilting it in
the opening on the top of the rail.
Fasten at the end of each array
(10 Ft Lb).
Install the Grounding Lug on each
section of rail. Run copper wire to
connect them all.
Tighten to 3 Ft Lb.
The system is complete.