background image

SL151

Installation Instructions

8

Figure 12

3.

PITCH

Remove and save back screw on each side.

Adjust vertically, as required.

Reinstall and tighten screws. (See Figure 13)

4.

VERTICAL

Remove and save front screw on each side.

Adjust vertically, as required.

Reinstall and tighten screws. (See Figure 13)

Figure 13

5.

ROLL (Horizontal Tilt)

Shift bracket up or down in the side holes on one side
or the other by removing screws.

Adjust and tighten screws on bracket. (See Figure 13)

Connecting Control Wiring

1.

Unplug the SL151’s test cord (used for testing).

2.

Remove the jumper wire and supplied push button wiring
(previously installed in the

Pre-Test Lift before Installation

section) from the external terminal block. (See Figure 3)

3.

Connect control wiring following instructions included with
the controller and information in Table 1: Wiring Table

NOTE:

Any knockouts removed in the SL151 must be

replaced with a supplied rubber grommet (G).

4.

Feed the video and/or communications cables through the
knockout in the rear or top of the lift and connect it to the
projector.

NOTE:

Ensure there is enough slack in the cables to allow for

up and down movement of the lift.

5.

Secure cables as necessary using supplied mounting pads
(E) and cable ties (B).

CAUTION:

KEEP SL151 OPEN WHILE PROJECTOR IS

RUNNING OR IN COOLING MODE! Premature bulb failure
or damage to electrical components may occur if lift closes.

NOTE:

If SL151 is cycled up and down repeatedly the motor’s

thermal overload protection will stop operation.
Operation will resume when the thermal overload
resets (usually within 3 to 5 minutes).

Connecting to Power Supply

IMPORTANT ! :

This product must be connected to a

grounded metal, permanent wiring system, or an equipment-
grounding conductor must be run with the circuit conductors
and connected to the equipment-grounding terminal or lead on
the product.

1.

Disconnect and remove power inlet from interior junction
box.

2.

Hardwire unit to a 120V 60Hz 12-amp power source.

NOTE:

This unit was designed to have conduit run directly into

the back of the interior junction box.

3

4

WARNING:

All wiring should be

performed by a licensed electrician
following all local codes and ordinances.

WARNING:

FAILURE TO

DISCONNECT AND TERMINATE POWER
LEADS PROPERLY MAY RESULT IN
PERSONAL INJURY OR EQUIPMENT
DAMAGE!! Licensed electrician must
disconnect and terminate the leads to the
power cord receptacle, and must hard wire
the SL151 to a 12-amp power source.

Summary of Contents for SMART-LIFT SL151

Page 1: ...rference in a residential installation This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instructions may cause harmful interfer...

Page 2: ...ING TO REDUCE THE RISK OF BURNS FIRE ELECTRIC SHOCK OR INJURY TO PERSONS Always turn off power at source before putting on or taking off parts Use this mounting system only for its intended use as des...

Page 3: ...elemento de fijaci n Befestigungsteil festziehen Apertar fixador Serrare il fissaggio Bevestiging vastdraaien Serrez les fixations Loosen Fastener Aflojar elemento de fijaci n Befestigungsteil l sen...

Page 4: ...2 578 6 514 1 582 7 22 50 20 28 215 9 284 5 579 4 571 5 65 5 DIMENSIONS MILLIMETERS INCHES TABLE OF CONTENTS Disclaimer 2 Tools Required For Installation 3 Parts 3 Legend 3 Dimensions 4 Installation...

Page 5: ...and wire the push button assembly D to contacts 1 red and 6 black See Figure 3 Figure 3 6 Plug in the SL151 test cord See Figure 2 NOTE See Figure 2 for location of external wiring terminal See Figur...

Page 6: ...sibility to make certain the structure to which the lift is being mounted is capable of supporting five times the weight of the lift and all attached equipment Reinforce the structure as required befo...

Page 7: ...lation 2 Use the provided push button D to operate the SL151 up and down ensuring that all clearances are adequate Installing Projector on SL151 NOTE The projector is secured from the top by an SLB br...

Page 8: ...for up and down movement of the lift 5 Secure cables as necessary using supplied mounting pads E and cable ties B CAUTION KEEP SL151 OPEN WHILE PROJECTOR IS RUNNING OR IN COOLING MODE Premature bulb f...

Page 9: ...See Figure 16 for terminal descriptions functions and wiring options Re Attaching Ceiling Panel 1 Line up rectangular holes in ceiling panel with clips on ends of rods and re attach the ceiling panel...

Page 10: ...0 Table 1 WIRING TABLE Figure 16 NOTE The numbers listed in the SL151 Internal and SL151 External columns refer to the corresponding numbers located where indicated in the wiring pictures See Figure 1...

Page 11: ...Installation Instructions SL151 11 Table 2 INTERNAL TERMINAL DESCRIPTIONS...

Page 12: ...SL151 Installation Instructions 12 Figure 17...

Page 13: ...Installation Instructions SL151 13...

Page 14: ...SL151 Installation Instructions 14...

Page 15: ...Installation Instructions SL151 15...

Page 16: ...Company www chiefmfg com 04 10 USA International A 8401 Eagle Creek Parkway Savage MN 55378 P 800 582 6480 952 894 6280 F 877 894 6918 952 894 6918 Europe A Fellenoord 130 5611 ZB EINDHOVEN The Nether...

Reviews: