
Installation Instructions
RSM Elite Series Projector Mounts
9
1b
Ø 6.3mm
(Ø 1/4”)
64mm
(2-1/2”)
Concrete Installation
1.
Determine mounting location.
WARNING:
IMPROPER INSTALLATION CAN
RESULT IN SERIOUS PERSONAL INJURY OR
DAMAGE TO EQUIPMENT! Structural members
MUST
be capable of supporting five times the
combined weight of all equipment being mounted.
2.
Using the RSM as a guide, mark four mounting hole
locations on ceiling using a pencil or similar tool.
3.
Drill four 1/4" (6.3mm) dia. pilot holes to a depth of
2-1/2" (64mm) deep.
4.
Align four mounting holes in RSM with four pilot
holes.
IMPORTANT ! :
Make sure mount is properly
oriented towards target before securing to
structure.
5.
Install four Toggler A6 Alligator concrete anchors
(not included) by inserting into pilot holes and
pounding in until flush with mounting surface.
6.
Secure RSM to structure using four #10 flat washers
and four #10 x 3" Phillips head wood screws. (not
included)
(A)
3
X4
X4
1
2
5
X4
6
X (4)
4