NE1F20-28-36-44
Installation Instructions
6
3.
Remove and save nut from the grounding lug on side rail.
(See Figure 4)
4.
Attach grounding wire from door to the grounding lug. (See
Figure 4)
5.
Replace and tighten nut onto grounding lug. (See Figure 4)
Figure 4
DANGER:
IMPROPER WIRING CAN LEAD TO DEATH
OR SEVERE PERSONAL INJURY! Grounding must be
installed by qualified personnel using a UL Recognized No.
12AWG Green and Yellow grounding wire connected to
grounding lug on rack.
6.
Change optional logo panel by removing and saving 4 nuts
from studs at inside top of front. (See Figure 5)
7.
Remove blank panel and replace with optional personalized
logo panel (not included). (See Figure 5)
8.
Replace and tighten four nuts removed in Step 6.
Figure 5
LOADING THE RACK
NOTE:
The alignment panels shipped with the racks are
optional. They may be removed to facilitate loading of
the racks.
Load Distribution
CAUTION:
BEGIN PLACEMENT OF LOAD AT BOTTOM
OF RACK! Load rack, moving from bottom toward top of rack.
Loading rack incorrectly may result in instability causing
possibly injury and/or damage to components.
1.
Begin placement of components into the rack at the lowest
point.
2.
Continue placing items into the rack, moving from the
bottom upward.
CAUTION:
DISTRIBUTE LOAD CORRECTLY! Load rack
with 2/3 total weight of components in the lower half of rack.
Loading rack incorrectly may result in instability causing
possible injury and/or damage to components.
3
5
Add door grounding wire
(front view of rack)
6
8
logo panel
(front view of rack)