background image

Checking the hydraulic
system

To set or check the hydraulic oil flow and the
pressure relief valve we recommend using Chicago
Pneumatic or similar test equipment.

0-250 bar (0-3,600 psi)

5-46 l.p.m. (1-12 US gal/min)

1. Stop the engine.

2. Connect the test equipment to the power pack.

Male (B) to the return connector and female (A)
to the feed connector on the power pack.

3. Make sure that the test equipment loading valve

is fully open.

4. Start the engine/motor.

5. Move the by-pass valve on the power pack to

the on position.

6. Turn the loading valve, until the gauge shows

approximately 70 bar (1,000 psi) and allow the
power pack to warm up for 3-4 minutes.

7. Slowly close the loading valve, until the pressure

gauge shows a pressure of 100 bar (1,400 psi).

8. Check that the flow is according to the flow rate

in the technical specifications.

9. The accuracy of the reading on the flow meter

is ±2 l.p.m. (±0.5 US gal/min). If the performance
is not in accordance with the technical
specifications for the power pack, see section
"Troubleshooting".

Transport

During transport make sure the power pack is
secured. Ensure that the power pack is upright
during transportation and lifted with approved lifting
equipment.

Operation

WARNING   

Involuntary start

Involuntary start of the machine may cause injury.

Keep your hands away from the start and stop
device until you are ready to start the machine.

Learn how the machine is switched off in the event
of an emergency.

Stop the machine immediately in all cases of
power supply interruption.

Operating

Preparation before starting

The following checks must be made each time you
start to use the power pack. All these checks concern
the serviceability of the power pack. Some concern
your safety:

Clean all safety labels. Replace any that are
missing or cannot be read.

Inspect the power pack and hoses generally for
signs of damage.

Remove dirt and debris especially from the
linkages and hydraulic oil cooler.

Check for oil and fuel leakages beneath the power
pack.

Ensure that the hydraulic couplings are clean and
fully serviceable.

Check all fastenings.

Check the hydraulic oil level and add as necessary.

13

3392 5183 01b | Original instructions

Safety and operating instructions

PAC P13

Summary of Contents for PAC P13

Page 1: ...ohol or medication Drugs alcohol or medication may impair your judgment and powers of concentration Poor reactions and incorrect assessments can lead to severe accidents or death Never use the machine...

Page 2: ...ff any spilled fuel Check regularly for fuel leaks Never use the machine if it is leaking fuel Never use the machine in the proximity of material that can generate sparks Remove all hot or spark gener...

Page 3: ...to reduce disturbance of dust in a dust filled environment Operate and maintain the machine as recommended in the operating and safety instructions Select maintain and replace consumables inserted too...

Page 4: ...nded in these instructions Select maintain and replace the insertion tool as recommended in these instructions If the machine has a silencer check that it is in place and in good working condition Alw...

Page 5: ...aulic oil level M Pressure relief valve N Hydraulic oil filter O Drain plug P Hydraulic pump Q Foldable handles Labels The machine is fitted with labels containing important information about personal...

Page 6: ...e can whip uncontrollably if screws loosen or are loosened A whipping hydraulic hose can cause severe injuries Depressurise the hydraulic system before loosening the connection of a hydraulic hose Tig...

Page 7: ...ting than the standard setting of the machine Hydraulic control and connectors C H G The by pass valve C must be in the OFF position when starting and in the ON position when using the machine Connect...

Page 8: ...ection Troubleshooting Transport During transport make sure the power pack is secured Ensure that the power pack is upright during transportation and lifted with approved lifting equipment Operation W...

Page 9: ...he power pack is started with new hoses these will take approx 1 5 litres 0 4 US gal of oil to fill up Add this amount of oil after the first start up Start and stop Changing flow rate The flow rate c...

Page 10: ...llow the maintenance instructions carefully Before starting maintenance on the machine clean it in order to avoid exposure to hazardous substances See Dust and fume hazards Use only authorised parts A...

Reviews: