3-position function switch :

- measurement of incident power
- measurement of reflected power
- battery charge test

Measurement push button to start the instrument, automatic cut-off after approximately 10 mins.

operation.

2.2

2.2

2.2

2.2

2.2

Bac

Bac

Bac

Bac

Back

k

k

k

k

A battery compartment access cover is located at the base of the back of the instrument (see § 5.1
Replacing the batteries).

3.

3.

3.

3.

3. USING 

 USING 

 USING 

 USING 

 USING THE INSTR

THE INSTR

THE INSTR

THE INSTR

THE INSTRUMENT

UMENT

UMENT

UMENT

UMENT

3.1

3.1

3.1

3.1

3.1

Installation

Installation

Installation

Installation

Installation

n

First ensure that the transmitter is not turned on.

n

Connect the instrument between the transmitter output and the antenna or the 50 

Ω 

load.

n

Put the function switch on the “Battery test” position, press on the Measurement push button and
check the battery charge status on the galvanometer.  If they are adequately charged, the needle
should be in the range indicated on the galvanometer.  Otherwise, to change the batteries, refer to
§ 5.1 Replacing the batteries.

3.2

3.2

3.2

3.2

3.2

Measurement of incident po

Measurement of incident po

Measurement of incident po

Measurement of incident po

Measurement of incident power

wer

wer

wer

wer

n

Put the function switch 

 on “Incident power”.

n

Position the switch 

 on the highest s 40 dBm

n

Turn on the transmitter

n

Press on the Measurement button

n

If the galvanometer deviation is insufficient, select the most appropriate range for reading the
measurement on the corresponding scale.

3.3

3.3

3.3

3.3

3.3

Measurement of reflected po

Measurement of reflected po

Measurement of reflected po

Measurement of reflected po

Measurement of reflected power

wer

wer

wer

wer

n

Put the function switch 

 on “Incident power”.

n

Position the switch 

 on the highest s 35 dBm

n

Press on the Measurement button

n

If the galvanometer deviation is insufficient, select the most appropriate range for reading the
measurement on the corresponding scale.

Note:

Note:

Note:

Note:

Note:
The instrument only starts operating when the Measure button is pressed.  This enables a comfortable
battery charge life.
The instrument powers down automatically, 5 to 10 minutes after being turned on.
If you have not finished testing, press the Measurement button again.

Summary of Contents for ORITEL RW 521

Page 1: ...R TTMETER TTMETER ORITEL ORITEL ORITEL ORITEL ORITEL R R R R RW W W W W 521 521 521 521 521 F R A N A I S F R A N A I S F R A N A I S F R A N A I S F R A N A I S E N G L I S H E N G L I S H E N G L I...

Page 2: ...re 41 dBm 12 W n Avant d utiliser l appareil s assurer que l metteur v rifier n est pas en fonctionnement n Si l ordre de grandeur de la puissance mesurer n est pas connu s lectionner le calibre le pl...

Page 3: ...bles feeder antenne quipant les stations de radiot l phonie des r seaux ruraux UHF Il est destin mesurer la puissance incidente circulant sur une ligne coaxiale d imp dance 50 et la puissance r fl chi...

Page 4: ...3 2 3 2 3 2 3 2 M M M M Mesure de la puissance incidente esure de la puissance incidente esure de la puissance incidente esure de la puissance incidente esure de la puissance incidente n Mettre le com...

Page 5: ...r vice apr s vente ou des r parateurs a s a s a s a s agr s gr s gr s gr s gr s 5 1 5 1 5 1 5 1 5 1 Remplacement des piles Remplacement des piles Remplacement des piles Remplacement des piles Remplace...

Page 6: ...is not in operation n If you do not have an approximate idea of the power be measured set the power output to the highest value before switching the instrument on then lower to the appropriate range s...

Page 7: ...to verify transmitters and feeder antenna units in UHF rural network radiotelephony stations It is intended to measure incident power circulating on a 50 impedance coaxial line and the power reflected...

Page 8: ...cing the batteries 3 2 3 2 3 2 3 2 3 2 Measurement of incident po Measurement of incident po Measurement of incident po Measurement of incident po Measurement of incident power wer wer wer wer n Put t...

Page 9: ...Sales Ser y its After Sales Ser y its After Sales Ser y its After Sales Ser y its After Sales Service or appr vice or appr vice or appr vice or appr vice or appro o o o oved ved ved ved ved repairer r...

Page 10: ...A ANNEXE ATT TT TT TT TTA A A A ACHMENT CHMENT CHMENT CHMENT CHMENT V V V V Vue de la face a ue de la face a ue de la face a ue de la face a ue de la face av v v v vant Fr ant Fr ant Fr ant Fr ant Fro...

Page 11: ...11...

Page 12: ...Deutschland CA GmbH Stra burger Str 34 77694 Kehl Rhein Tel 07851 99 26 0 Fax 07851 99 26 60 Espa a Espa a Espa a Espa a Espa a CA Iberica C Roger de Flor N 293 4 1a a a a a 08025 Barcelona Tel 93 459...

Reviews: