20
LT5049 (ISS 2)
PREPARING THE APPLIANCE FOR A GAS CONNECTION
If it is intended to be a concealed connection the 8mm supply should be positioned in the opening first.
The pipe should be positioned so that when the appliance is pushed back into the opening it enters the grommet
hole at least 180mm, taking into account the requirements of BS 6891 1988 dealing with enclosed pipes.
Note: pipe-work in the opening of the fireplace to the rear of the appliance must be suitably wrapped in accordance
with the regulations.
Taking great care grip the copper protective sleeve at
the end of the gas control spindle (DO NOT GRIP
SPINDLE IN ANY OTHER PLACE) as shown and remove
the screw from the end as shown above.
Ensure the spindle is pushed back inside the control
valve as far as possible. Ensure the bell crank
mechanism is swung up to give easy access to the
gas connection point as shown.
Cut a cross slit in the rubber grommet and feed the
appliance onto the 8mm-gas supply pipe. Position
the restrictor elbow supplied and mark supply pipe
at its cut off length. Remove appliance, cut pipe to
correct length, refit appliance and make gas
connection with restrictor elbow use 15mm A/F
spanner taking care not to apply any force to the gas
control spindle as above. Ensure the restrictor valve
is opened and its cap replaced tightly.
Check for gas soundness. Reconnect the bell crank
mechanism as above ensuring that the gas control
spindle is gripped only over the protective copper
sleeve and no other part of the spindle as, ensure
NO side strain is applied to the spindle.
Summary of Contents for PARAGON 2000 Plus Low Lintel SLIDE CONTROL
Page 27: ...www charltonandjenrick co uk 27 LT5049 ISS 2 ...
Page 28: ...28 LT5049 ISS 2 ...