www.charltonandjenrick.co.uk
25
LT 8381 (ISS 01)
800 HD B.F. with UBL INSTALLATION NSTRUCTION
Connecting the Gas & Power Supply (installation instructions)
TURN OFF ANY GAS APPLIANCES THAT ARE FED BY THE METER AND ISOLATE THE GAS SUPPLY BY TURNING OFF AT
THE METER.
•
The Gas & Power supply must be assessed at this stage.
•
For ease of installing the Gas Supply , the front outer frame
can be removed by undoing the 6 x screws on the sides and
lifting the fame upwards and outwards.
•
The Gas Connection can be made by removing the gas inlet
cover located on the left hand side of the fire box sump
assembly.
•
Remove the middle burner tube, by undoing the 2 x screws
on the burner bracket and lifting away.
•
Remove the 8 off fixing screw and remove the plate plus
gasket.
Please note special attention should be taken not
to damage the gasket.
•
You will then have access to the isolating cock which is
fitted in the supply feed.
The appliance is supplied with a factory fitted isolation
device to allow for an 8mm copper connection. No further
isolation point is required.
•
THE GAS INLET ISOLATION DEVICE MUST BE ANGLED TO ALLOW ACCESS TO THE GRUB SCREW AND GAS TEST
NIPPLE.
•
When a concealed gas fitting from the rear is required it is necessary to route the pipe to the left side of the unit,
taking into account the requirements of BS 6891 1988 dealing with enclosed pipes.
When installing the firebox into a cavity wall, any part of the installation pipe work installed in the void open to the
cavity wall must be enclosed in a gas tight sleeve. It must be sealed at the point at which the sleeved installation pipe
enters the fire (The Gas Safety (Installation and Use) Regulations Certificate of exemption number 1 of 1996).
Where
the pipe enters the fire the outer sleeve must be sealed to the grommet and the pipe must be sealed to its outer
sleeve using suitable mastic.
POWER LEAD ROUTING
•
The power supply for this appliance is provided via AC power adaptor 230 VAC. The main cable terminates at the
rear middle of the fire box. The length of the cable provided with the appliance is 1.65 metres. Care must be
taken when siting the fire box not to trap the exposed main cable within the builders opening.
•
The cable can be routed by passing the cable through the side of the chimney breast. It is good practice to run
the cable within a sleeve of at least 15mm internal diameter, sealing the sleeve using a suitable sealant at the
point the sleeve / cable terminates the chimney masonry.
•
With power points that exceed the 1.65 metre distance, an optional 2.0 metre extension cable is available Part
No 7147.
•
The battery manual override option is a backup supply in case of a power failure / power cut to the property.
The battery holder and adaptor lead are provide within the packing of the appliance. (Please note that the “C”
cell batteries are not included). It is good practice to demonstrate the battery option to the customer during the
commissioning process.
Summary of Contents for INFINITY 800HD BF UBL
Page 32: ...32 LT 8381 ISS 01 800 HD B F with UBL FAULT FINDING INSTRUCTIONS FAULT FINDING CHARTS ...
Page 34: ...34 LT 8381 ISS 01 800 HD B F with UBL FAULT FINDING INSTRUCTIONS FAULT FINDING CHARTS 1 ...
Page 39: ...www charltonandjenrick co uk 39 LT 8381 ISS 01 ...
Page 40: ...40 LT 8381 ISS 01 ...
Page 42: ...42 LT 8381 ISS 01 ...
Page 43: ...www charltonandjenrick co uk 43 LT 8381 ISS 01 ...