Chandler Systems UV-10DH Operation & Installation Instructions Download Page 17

1 7 |

P a g e

System Service Suggested

UV D & UV DH controllers will display the System Service Suggested Screen 

every 6 months to remind consumers to maintain both their UV and other 

prefiltration. This will serve as a prompt only and will not put the system 

into alarm. To clear this condition simply press the button located below 

the screen.

Lamp Replacement (

UV / UVH

 systems)

After the lamp is expired, it must be replaced with the same part number as indicated by the 

label on the reactor.  Begin replacing the lamp by unplugging the power for the controller, then 

refer to Installation, starting with step 11 (page 11) for instructions on installing the new lamp. 

To reset the timer in the controller, firmly hold down the button on the controller for 10 seconds. 

The controller will read “rSt3”, “rSt2”, “rSt1” and then beep.

 The button can now be released, the 

lamp countdown timer has been reset. 

Lamp Replacement (UV DM / UV DHM systems)

After the lamp is expired, it must be replaced with the same part number as indicated on the 

Maintenance Parts screen or on the label on the reactor.  With the system powered down, re-

move and discard the lamp key from the controller. The replacement lamp is packaged with a 

lamp key on the connector at the end of the lamp.  Remove the key from the lamp and place it in 

the controller.  Refer to Installation, starting with step 11 (page 11) for instructions on installing 

the new lamp.

QR Codes

QR code (Quick Response code) is a matrix barcode first designed for the 

automotive industry. CHANDLER uses the QR code to store a link to a specific 

page on our website. Users with a camera phone equipped with the correct 

reader application can scan the image of the QR code and over a wireless 

network connect to a CHANDLER web page in the phone’s browser. CHAN-

DLER’s QR webpage has information on how to purchase replacement com-

ponents as well as a helpful video directory on system servicing (i.e. How to 

change a UV lamp or quartz sleeve). To access the QR code on the CHANDLER 

controller, press the control button until the QR code screen appears.

Flow Meter

Coming Soon.

            

Summary of Contents for UV-10DH

Page 1: ...V 5H UV 5DH UV 5DHM 5 gpm UV 3 UV3D UV3DM 3 gpm UV 10H UV 10DH UV 10DHM 10 gpm UV 6 UV6D UV6DM 6 gpm UV 15H UV 15DH UV 15DHM 15 gpm UV 11 UV11D UV11DM 11 gpm UV 25H UV 25DH UV 25DHM 25 gpm UV 15 UV15D...

Page 2: ...pply with a UV system gives you reassurance that your family will have access to safe drinking water throughout your entire home with no chance of microbiological contamination This is chemical free p...

Page 3: ...llers 14 Power up Sequence not UV systems 14 UV D UV DH Operational Screens 15 UV DM UV DHM Operational Screens 16 Lamp Countdown Sequence 16 Lamp Replacement UV UVH systems 17 Lamp Replacement UV DM...

Page 4: ...vice instructions if required 7 Do not use this system for any purpose other than what it was intended for Misuse of this system could potentially cause harm to the user or others 8 Your system is int...

Page 5: ...required will depend on parameters being treated Hardness 7 gpg 120 mg L if hardness level is 7 gpg or slightly below the quartz sleeve must be cleaned periodically in order to ensure effi cient UV p...

Page 6: ...an UV D UV DM SYSTEMS UVC 5 North American 300016 Complete Assembly 310026 Teflon Plug 310040 O Ring 390007 Brass Nut UVS 2 5 UVDM 2 3 6 11 15 series UVS 3 5 UVDM 20 series GLAND NUT O RING SLEEVE SPR...

Page 7: ...nits UV DH UV DHM SYS TEMS UVC 4H fits all units POWER CORD 300016 Complete Assembly 310026 Teflon Plug 310040 O Ring 390007 Brass Nut UVS 3 5H Standard series 260004 North American 320006 310038 UVLM...

Page 8: ...or tap near est the pressure system and measure the amount of water drawn off until the pump starts again Depending on the size of the container used it is acceptable to turn the faucet on and off to...

Page 9: ...s it will allow you to isolate the UV reactor This will allow for easier access in case maintenance is required See Figure 3 Step 3 Use the supplied fasteners to mount the UV reac tor to wood or drywa...

Page 10: ...SE NOTE DO NOT install a UV lamp inside the quartz sleeve without the sleeve spring in place Step 8 Install the UV sensor UVDM systems only Align the flat portion so it faces the gland nut end and mat...

Page 11: ...ou The key will plug into the lamp key port on the right side of the controller Figure 8 Step 13 Plug the lamp connector into the lamp Note the keying for proper alignment see Fig ure 7a 7b Insert the...

Page 12: ...eaning At a minimum the quartz sleeve should be cleaned on an annual basis The following steps outline a basic clean ing procedure Step 1 If a by pass assembly is installed shut the inlet valve off to...

Page 13: ...of the sensor port Step 6 Holding the sensor in your hand wipe the flat portion sensor face of the sensor with isopropyl alcohol using a clean lint free cloth Step 7 Replace sensor following step 9 fr...

Page 14: ...description of the system s performance in addition to pro viding any applicable fault messages and system diagnos tics The controllers used in both the UVD and UVDM are identical The difference is t...

Page 15: ...ts screens by pressing the button located on the front of the controller UV DM UV DHM Operational Screens On systems with the UV monitor the system will display the same screens as on the UVD except t...

Page 16: ...ible chirp Past the zero day threshold the LED or display screen changes to solid red with a continuous buzzer UV D DM UV DH DHM UV UVH At any point during this sequence the audible chirp or alarm can...

Page 17: ...pired it must be replaced with the same part number as indicated on the Maintenance Parts screen or on the label on the reactor With the system powered down re move and discard the lamp key from the c...

Page 18: ...on the reactor or on the Maintenance parts screen Low UV Intensity Remove and clean the quartz sleeve and sensor Check water quality meets requirements on page 5 and add filtration as required Replac...

Page 19: ...to the system Replace any module that is not detected when plugged directly into the controller COMING SOON Warning After any hard alarm the home or facility should be disinfected Follow the steps un...

Page 20: ...to allow fresh cooler water to enter the system The TRV works with out power and comes complete with 10 of drain line Order PN UV TRV 0 5 for 1 2 ports PN UV TRV 0 75 for 3 4 ports PN UV TRV 1 for 1 p...

Page 21: ...L1 4 20 mA MODULE Outputs a 4 20mA signal of the UV output to a remote device such as a data logger or computer Order PN UVMOD 420 The WiFi module and accompanying IoT application allows you to connec...

Page 22: ...9 62 51 Replacement Lamp UVLMP 2 UVLMP 3 UVLMP 6 UVLMP 11 UVLMP 15 UVLMP 20 Replacement Sleeve UVQTZ 2 UVQTZ 3 UVQTZ 6 UVQTZ 11 UVQTZ 15 UVQTZ 20 Reactor Dimensions 6 4 x 26 2 cm 2 5 x 10 3 6 4 x 36 4...

Page 23: ...0 2 m3 hr 0 5 m3 hr 0 6 m3 hr 1 1 m3 hr 1 8 m3 hr Port Size MNPT MNPT 1 MNPT 1 MNPT 1 MNPT Electrical 90 265V 50 60Hz 1 5A Max Lamp Power Watts 18 34 45 67 101 Power Watts 20 36 48 72 108 Replacement...

Page 24: ...CHANDLER s closest Distribution Facility or authorized service depot CHANDLER will not be liable for any costs of removal installation transportation or any other charges which may arise in connectio...

Page 25: ...PRODUCT AND IS GIVEN IN LIEU OF ANY OTHER WARRANTY TO THE EXTENT ALLOWED BY APPLICABLE LAW ANY AND ALL EXPRESS OR IMPLIED WARRANTIES NOT SET FORTH HEREIN ARE WAIVED AND DISCLAIMED INCLUDING ANY IMPLI...

Page 26: ...2 6 P a g e...

Page 27: ...2 7 P a g e...

Page 28: ...Chandler Systems 710 Orange Street Ashland OH 44805 Phone 888 363 9434 www chandlersystemsinc com PN 910181 Version Date 03 2020...

Reviews: