7
6
5
4
3
2
1
8 9
+
10
Exit Loop
Safety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
7
6
5
4
3
2
1
8 9
+
10
Exit Loop
Safety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
7
6
5
4
3
2
1
8 9
+
10
Exit Loop
Safety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
7
6
5
4
3
2
1
8 9
+
10
Exit Loop
Safety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
7
6
5
4
3
2
1
8 9
+
10
Exit Loop
Safety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
7
6
5
4
3
2
1
8 9
+
10
Exit Loop
Safety Loop
Or Photocell
Strike Open or
Push Button
Fire Dep
Key Switch
Radio Receiver
-
CSW / SL Surge Protection Module
Step-by-Step instructions
STEP 2
Remove J1 plug.
STEP 1
STEP 9
STEP 11
Use supplied wire nuts to connect the AC wire coming from
the outlet (through the channel in the electrical box) to the
plug (black to black and white to white wires 16 AGW).
STEP 12
STEP 10
Connect the plug of the Surge Protector to the J1 connector on
the control board.
STEP 7
Place the Surge Protector module in place of the terminal
block. Use a nut driver to secure the 2, 1 inch long hex nuts
that came with the module.
STEP 8
Remove the control board
and unscrew the lower left
hex nut
under
the board.
Slip the ring terminal on
the screw stud. Make sure
ring is in contact with the
control box. Re-screw the
hex nut and re-attach the
control board.
STEP 5
Use a nut driver and remove the 2 hex nuts holding the
terminal block connector (10 terminals) on the electrical box.
STEP 6
Remove the terminal block connector from the electrical box.
STEP 3
Remove the wire nuts from the black and white wires (16 AGW)
coming from the plug .
STEP 4
Remove all the accessory wires attached to the terminal block.
Make sure to mark all the wires you are removing to reconnect
them later.
OffO
ff
OffO
ff
OnO
n
OnO
n
OnO
n
OffO
ff
OffO
ff
OffO
ff
OnO
n
OffO
ff
OffO
ff
Gate
Operator
Main
Room
Eug. Rm
Oper. Rm
Eug. Dept.
Manu. 1 Rm
Main Dept.
Manu. 2 Rm
Air (1)
Conditioner
Air (2)
Conditioner
Conference
Room 1
Conference
Rm 2, 3
Refer.
Bus 1, 2, 3
Conference
Room 2
Comp.
Serve 2
Comp.
Serve 1
Turn the gate operator off by turning off the building/facility
breaker for the 120 Vac supply to the gate operator.
P/N Q411 – PATENT PENDING
P/N Q411 – PATENT PENDING
®
STRIKE OPEN
PUSH BUTTON
STRIKE OPEN
PUSH BUTTON
FIRE DEPT
KEY SWITCH
FIRE DEPT
KEY SWITCH
CLASS 2
SUPPLY
CLASS 2
SUPPLY
SAFTEY
LOOP
SAFTEY
LOOP
RADIO
RECEIVER
RADIO
RECEIVER
EXIT
LOOP
EXIT
LOOP
–
–
+
+
CSW / SL
SURGE
SUPPRESSOR
P/N Q411 – PATENT PENDING
P/N Q411 – PATENT PENDING
®
STRIKE OPEN
PUSH BUTTON
STRIKE OPEN
PUSH BUTTON
FIRE DEPT
KEY SWITCH
FIRE DEPT
KEY SWITCH
CLASS 2
SUPPLY
CLASS 2
SUPPLY
SAFTEY
LOOP
SAFTEY
LOOP
RADIO
RECEIVER
RADIO
RECEIVER
EXIT
LOOP
EXIT
LOOP
–
–
+
+
CSW / SL
SURGE
SUPPRESSOR
P/N Q411 – PATENT PENDING
P/N Q411 – PATENT PENDING
®
STRIKE OPEN
PUSH BUTTON
STRIKE OPEN
PUSH BUTTON
FIRE DEPT
KEY SWITCH
FIRE DEPT
KEY SWITCH
CLASS 2
SUPPLY
CLASS 2
SUPPLY
SAFTEY
LOOP
SAFTEY
LOOP
RADIO
RECEIVER
RADIO
RECEIVER
EXIT
LOOP
EXIT
LOOP
–
–
+
+
CSW / SL
SURGE
SUPPRESSOR
P/N Q411 – PATENT PENDING
P/N Q411 – PATENT PENDING
®
SAFTEY
LOOP
SAFTEY
LOOP
EXIT
LOOP
EXIT
LOOP
CSW / SL
SURGE
SUPPRESSOR
There is a green wire with a ring terminal coming out of the
Surge Protection module,
This ring terminal
MUST
make good
contact with the chassis of the gate operator.
Reconnect the accessory wires to the Surge Protector. Match
them up with the label on the module. All the connectors on
the module are removable for easy wiring.
P/N Q411 – PATENT PENDING
P/N Q411 – PATENT PENDING
®
STRIKE OPEN
PUSH BUTTON
STRIKE OPEN
PUSH BUTTON
FIRE DEPT
KEY SWITCH
FIRE DEPT
KEY SWITCH
CLASS 2
SUPPLY
CLASS 2
SUPPLY
SAFTEY
LOOP
SAFTEY
LOOP
RADIO
RECEIVER
RADIO
RECEIVER
EXIT
LOOP
EXIT
LOOP
–
–
+
+
CSW / SL
SURGE
SUPPRESSOR
®
CSW / SL
SURGE
SUPPRE
OffO
ff
OffO
ff
OnO
n
OnO
n
O
n
O
n
OffO
ff
OffO
ff
OffO
ff
OnO
n
OffO
ff
OffO
ff
Gate
Operator
Main
Room
Eug. Rm
Oper. Rm
Eug. Dept.
Manu. 1 Rm
Main Dept.
Manu. 2 Rm
Air (1)
Conditioner
Air (2)
Conditioner
Conference
Room 1
Conference
Rm 2, 3
Refer.
Bus 1, 2, 3
Conference
Room 2
Comp.
Serve 2
Comp.
Serve 1
Turn the gate operator back on by turning on the
building/facility breaker for the 120 Vac supply to the gate
operator.
®
™