12
Installation
3 Attach the Rail to the Header Bracket
1.
Align the rail with the header bracket. Insert the clevis pin through the holes in the header bracket and rail.
Secure with the ring fastener.
NOTE:
Use the packing material as a protective base for the door operator.
HARDWARE
Clevis Pin 5/16" x 2-3/4"
Ring Fastener
Ring
Fastener
Clevis Pin
5/16" X 2-3/4"
4 Position the operator
To prevent damage to door, rest door operator rail on 2x4 placed on top section of door.
1.
Lift the door operator onto a ladder.
2.
Fully open the door and place a 2x4 (laid flat) under the rail.
A 2x4 is ideal for setting the distance between the rail and the door. If the ladder is not tall enough you will need help at
this point. If the door hits the trolley when it is raised, pull the trolley release arm down to disconnect the inner and
outer trolley. Slide the outer trolley toward the door operator. The trolley can remain disconnected until instructed.
Connected
Disconnected