Symbols used in the Manual
The signage (ISO) indicated below is used within this manual to focus attention on those operations
that must be performed carefully in order to guarantee safety during installation.
GENERAL
DANGER
Indicates that, when performing the operation,
great care must be taken to prevent the onset of
events that could cause serious injury or damage.
ELECTRICAL
DANGER
Indicates that, when performing the operation, an
event (of an electrical nature) could arise leading
to injury or damage.
DANGER OF
PINCHING
Indicates that, during installation or transport of
system components, suitable lift equipment must
be used and utmost attention applied.
DANGER OF
FALLING
Indicates that, during installation, the operator
crosses zones where there is high risk of falling;
always be particularly careful.
IMPORTANT
Indicates that the indications or instructions
described in the text must be followed to the
letter. Non-compliance with the indications can be
dangerous for the operator and can damage the
system.
PROHIBITION
Indicates that the specific activity or operating
sequence must be avoided
Technical Data
LIFT CAPACITY
14,000 lbs.
MOTOR POWER
3 HP
ELECTRIC POWER SUPPLY
1 Ph
208-240V
23 A
3 Ph
230V
13 A
60 Hz
PNEUMATIC SUPPLY
90-120 PSI
20 CFM
Filtered and
lubricated
MAXIMUM HYDRAULIC PRESSURE
4150 PSI
QUANTITY OF OIL
5.3 Gallons (20 Liters)
UPSTROKE/DOWNSTROKE TIME
75 sec / 20 sec
MIN/MAX OPERATING TEMPERATURE
-10 / +40 °C
Summary of Contents for SX14
Page 4: ...4 LIFT BASE LAYOUT Fig 2 Base Layout PIT LAYOUT Fig 3 Pit Details...
Page 9: ...9...
Page 10: ...10 CONTROL UNIT 34 5 16 3 17 4 2 28 14 12 27 26 26 29 31 30 35...
Page 11: ...11 LABEL 2 LABEL 2A LABEL 3 LABEL 3A LABEL 4 LABEL 4A LABEL 5 LABEL 5A...
Page 12: ...12 LABEL 12 LABEL 14 LABEL 14A LABEL 16 LABEL 17...
Page 13: ...13 LABEL 22 LABEL 23 LABEL 25 LABEL 26 LABEL 27 LABEL 28 CHALLENGER SERIAL TAG LABEL 29...
Page 14: ...14 LABEL 30 LABEL 31 LABEL 34 LABEL 35 LABEL 35A...
Page 22: ...22 AIR SWITCH BASE SETTING...
Page 26: ...26 LUBRICATION POINTS repeat symmetrically on both sides of the lift...
Page 30: ...30 Fig 13 Electrical Wiring Diagram Console Lid Switches...
Page 31: ...31 Fig 13 Electrical Wiring Diagram Continued...
Page 32: ...32 Fig 14 Hydraulic Diagram...
Page 33: ...33 Fig 15 Pneumatic Diagram...
Page 34: ...34 PARTS BREAKDOWN 11 16 10 12 10 9 7 8 6 5 2 1 4 3 13 12 15 14...
Page 36: ...36 7 12 14 5 3 4 16 6 10 9 11 15 8 17 17 13 18 2 19 20 21 1 350 BAR 110 BAR...
Page 38: ...38 1 4 5 9 11 12 18 15 13 20 23 22 21 24 6 2 14 25 16 26 3 8 3 7 10...
Page 40: ...40 26 42 24 44 43 47 48 49 50 25 42 43 27 28 30 31 32 29...
Page 42: ...42...
Page 44: ...44 29 48 47 21...