5.0 Installation Guide
9
5.1 Uncrating the Paper Drill
This machine is shipped on a wooden skid and is enclosed with a protective corrugated cover. It is
held onto the skid with plastic straps. Remove the straps and carefully cut the corrugated cover down
the side and unwrap it from around the machine. The table, backgauge, and other accessories are
packed in separate boxes and are secured to the machine. Remove these and carefully position the
machine on the floor. Immediately after uncrating, check off parts received against the packing list.
Also, examine for any physical signs of damage incurred during shipping. The machine is inspected
before and after it is crated at our plant. The responsibility for filing a claim against the carrier for
damages incurred during shipment rests with the receiver of goods (FOB our factory).
Clean all parts with a commercial cleaning solvent before installing or using the machine.
5.2 Installing the Table and Backgauge
Locate the four (4) table mounting bolts, washers, & nuts shipped in the backgauge box. Set the
table assembly in place and attach using the hardware as shown in Figure 2, but leave the hardware
loose.
Figure 2
5.2.1 Using Standard Backgauge:
Attach the backgauge assembly to the table and set both sides to the 6-5/8” position (as shown in
Figure 3
on page 10). Next, position the table so that the back surface of the backgauge comes in
contact with the front of each pull down shaft (Figure 4
on page 10). Now tighten the front two table-
mounting screws. Then move the backgauge forward and tighten the rear two screws.