Cerbos BLOWAIR S1 Technical Documentation Manual Download Page 8

Blowair devices can be assembled on the wall or ceiling 

via  holder  or  rotational  holder  ,  which  are  additional 

elements . It is possible to assemble the device in parallel 

on the angle 60°  and 45°.

4. INSTALLATION INSTRUCTIONS

The  installation  should  be  made  by  the  qualified  stuff, 

who  possess  the  needed  rights  to  install  electrical 

devices, as instructed in the following documentation. To 

install the air waiter heater Blowair S1, S2, S3, S4 use the 

duct size 2 x 2,5mm².

5. PRECAUTIONS & WARNINGS

All  works  concerning  electrical  installation  should  be 

made  by  the  qualified  stuff,  who  possess  the  qualifica-

tions due to the domestic and local norms. These recom-

mendations include service and disassembly as well. Not 

following to the recommendations may cause electrocu-

tion, device damages or its incorrect work. 

- Before service or exchange of the device it is obligatory 

to cut off the current supply.

- Do not cover the inlet and outlet of the device.

-  Do  not  use  the  device  in  room  with  high  moisture  or 

close to the water basin. 

-  Do  not  install,  service  the  device  with  wet  hands  or 

barefoot. 

- Do not use the device in room with inflammable fumes, 

gas and high concentration of dust.

- The device should be kept out of reach of children and 

animals.

-  During  the  assembly  use  the  filter  on  the  hydraulic 

supply.

- Please use the following valves:

-  vent  valve  in  the  highest  place  on  the  hydraulic 

installation,

 - cut off valve on the supply and return of the device.

- The device should be secured against pressure increase 

in the water installation. 

-  Before  plugging  the  electric  supply  check  the  leak 

tightness.

- The device does not consist of the anti-frost protection. 

- The temperature in the room should not go below 0°C. 

In such case please empty the device out of water.

-  It  is  recommended  to  check  the  electric  installation 

before the first start.

- It is recommended to use the external current differen-

tial protection. 

- After the turn off, the elements of device may be warm. 

-  After  operating  time  of  the  device,  please  utilize  it 

concerning the local norms and regulations. 

- It is recommended to clean the device periodically:

- heating coil blow through by compressed air,

- fan casing and blades clean form the dirt.

- If the device is not used for a longer time disconnect the 

voltage supply.

- The device is transported with the closed air stators. It is 

essential  to  open  them  in  30  %  before  first  start.  Not 

keeping to the following recommendation may cause the 

damages of the fan. 

- Opening the air stators must be made by two hands in 

parallel.  Not  keeping  to  the  following  recommendation 

may cause the damages of the air stators.

While  plugging  the  device  to  the  water  installation  do 

remember  to  hold  its  stub  pipes  by  pipes  spanner,  not 

keeping to the recommendation may cause the damages 

of the heating coil.

6. BLOWAIR AUTOMATICS

To make easier the usage of the Blowair devices we also 

offer the additional automatics:

3-stage  speed  controller  Blowair  RX  0,6A  for  S1

-    is 

used to control the speed in single-phase fans. It consists 

of  3  controls  0-85-130-230V,  power  supply  voltage-

230VAC / 50-60Hz, allowable current output: 0,6A; protec-

tion:  thermal  breaker  switch;  dimensions:  118mm  x 

78mm x 55mm; weight: 0,7 kg. It is recommended to use 

RX 0,6A speed controller to Blowair S1 device.

5-stage speed controller Blowair RX 1,2A

-  is used to 

control  the  speed  in  single-phase  fans.  It  consists  of  5 

controls    0  -  70  -  85  -  105  -  145  -  230V,  power  supply 

voltage-230VAC  /  50-60Hz,  allowable  current  output: 

1,2A;  protection:  thermal  breaker  switch;  dimensions: 

126mm  x  176mm  x  56mm;  weight:  1,3  kg.  It  is  recom-

mended  to  use  one  speed  controller  to  each  Blowair 

device.

5-stage  speed  controller  Blowair  RX  3A

-    is  used  to 

control  the  speed  in  single-phase  fans.  It  consists  of  5 

controls    0  -  70  -  85  -  105  -  145  -  230V,  power  supply 

voltage-230VAC / 50-60Hz, allowable current output: 3A; 

protection: thermal breaker switch; dimensions: 126mm x 

176mm x 56mm; weight: 1,3 kg. It is possible to use one 

RX 3A speed controller for a few Blowair devices.

Two-way valve with actuator

 - connection diameter ¾”. It 

should  be  installed  on  the  return  (outlet)  pipe.  Using  it, 

lowers  the  living  costs.  It  is  essential  to  use  it  with  the 

temperature controller. After reaching the wanted tempera-

ture the valve cuts off the water inlet. Water runs in cycle and 

does not cool. The valve is not noisy. It is recommended to 

use one two-way valve with actuator to each Blowair device. 

Room thermostat 

- work environment parameters 0°C-40°C; 

setting  range10°C-30°C;  regulation  accuracy  1°C;  tempera-

ture  number  levels  1;  power  supply  voltage  230V.  It  is 

possible to use one room thermostat to maximum 5 Blowair 

devices. 

Programmable temperature controller 

- saving energy up 

to o 30%. It is possible to regulate the temperature up and 

down. LCD liquid crystal display. Temperature setting every 

0,2°C. It consists of  9 programmers. 3 levels of temperature- 

day,  night,  anti-frozen.  Work  environment  parameters 

0°C-40°C.  Setting  range  5°C-30°C.  Power  supply  2  alkaline 

battery  AA  (1,5V).  Permitted  control  output  load  230  VAC 

50Hz 5 (3) A. It is possible to use one programmable tempera-

ture controller to maximum 5 Blowair devices.

7. CONNECTION SCHEMES

PE- protective earthing, duct yellow-green colour; 

N- neutral, duct black-black colour; 

L- phase duct, duct brown colour; 

Empty clamp, duct blue-black colour.

Outlet

Inlet

Summary of Contents for BLOWAIR S1

Page 1: ...Dokumentacja techniczna Technical documentation Technische Dokumentation S1 S2 S3 S4...

Page 2: ...nia na wiele lat Produkt obj ty jest 24 miesi czn gwarancj 2 SCHEMATY IDEOWE 2 1 BUDOWA URZ DZENIA Obudowa Kierownice powietrza Wymiennik ciep a Wentylator osiowy Uchwyty monta owe Obrotowa konsola mo...

Page 3: ...8 24 10 37 4 46 3 1 64 17 20 30 1 50 2 1 32 12 Temperatura na zasilaniu C Temperatura powietrza wlotowego C Moc urz dzenia kW Temperatura powietrza wylotowego C Przep yw wody m h Spadek ci nienia w wy...

Page 4: ...air RX 0 6A do S1 przeznaczony do zmiany pr dko ci obrotowej wentylator w jednofazowych sterowanych napi ciowo w przemys owych systemach nawiewnych i grzewczych Regulator posiada trzystopniow transfor...

Page 5: ...a lub zbyt niska temperatura nas onecznienie itp samowolnych dokonanych przez u ytkownika lub inne nieupowa nione osoby napraw przer bek lub zmian konstrukcyjnych pod czenia dodatkowego wyposa enia in...

Page 6: ...Holders Rotational holder Casing is made of galvanizing steel powder painting in RAL color 9005 Air stators are made of galvanizing steel powder painting in RAL color 7048 It is possible to set the a...

Page 7: ...33 33 0 45 42 1 1 98 24 10 37 4 46 3 1 64 17 20 30 1 50 2 1 32 12 Inlet and outlet water temperature C Outlet water temperature C Heating capacity kW Outlet air temperature C Water flow m h Pressure d...

Page 8: ...recommendation may cause the damages of the air stators While plugging the device to the water installation do remember to hold its stub pipes by pipes spanner not keeping to the recommendation may c...

Page 9: ...oper storage b Defects through improper usage and service using the device in the improper conditions too high humidity too high or too low temperature impact of the surrounding sun ect modified equip...

Page 10: ...m number kg dm C C MPa A V Hz W rev min S1 16 7 7 17 1743 10 12 1 15 5 15 0 5 26 7 110 1 6 0 42 230 50 80 1380 54 3 4 S2 29 4 13 29 2973 10 18 2 22 3 21 1 3 27 5 110 1 6 0 66 230 50 150 1400 54 3 4 S3...

Page 11: ...8 1 69 20 90 70 10 60 3 44 3 2 66 41 0 52 1 48 7 2 29 31 10 44 3 52 9 1 95 23 20 36 8 56 9 1 62 16 Blowair S3 C C kW C m h kP 20 68 9 39 8 3 04 52 80 60 10 53 37 8 2 33 33 0 45 42 1 1 98 24 10 37 4 4...

Page 12: ...7 0 40 C IP 54 RX 0 6A Blowair S1 5 Blowair RX 1 2A 230V 50 60Hz 0 70 85 105 145 230V 1 2 126 176 56 1 3 Te Blowair S1 S2 S3 S4 5 Blowair RX 3A 230V 50 60Hz 0 115 135 155 180 230V 3 0 126 176 56 1 3...

Page 13: ...ysocki Tomasz ul Monta owa 3 43 300 Bielsko Bia a 24 S1 S2 S3 S4 II III 30 Blowair IV 14 Blowair V a b c VI Blowair VII VIII IX Blowair WTS Wysocki Tomasz ul Monta owa 3 43 300 Bielsko Bia a serwis bl...

Page 14: ...ryczny urz dzenia Adres i miejsce monta u urz dzenia Miasto Kod pocztowy Ulica Nr lokalu Miejsce Stamp and signature of the installation company Factory number of the device Address and place of assem...

Page 15: ...ompany reporting the complaint The company installing the device Factory number of the device Date of assembly Date and circumstances of noticing the defect Date of declaration the complaint Address a...

Page 16: ...Polska Poland Polen Lp Data zg oszenia usterki Data naprawy Dok adny opis naprawy Piecz tka serwisu Lp Date of declaration the complaint Date of repair Description of the repair Service stamp Nr Datu...

Reviews: