Installation Guide for FibeAir IP-20S, FibeAir IP-20S Assured
Page 103 of 105
Ceragon Proprietary and Confidential
9.4
IP
-
20 Commissioning Log
The Commissioning Log is an integral part of the commissioning procedure and
should be filled in for each installed link.
The Commissioning Log gathers all relevant information regarding the installed link and
contains a checklist of all recommended commissioning tests.
Maintaining the Commissioning Log is important for tracking your installations,
and to provide essential data for Ceragon Networks.
Upon completing the Commissioning Log, send the log to Ceragon support center
at
IP-20 LINK COMMISSIONING LOG
1. GENERAL INFORMATION
Customer:
Radio model:
Configuration:
Radio link code:
Site 1 name & add:
Site 2 name & add:
2. ODU/RFU
Site 1
Site 2
ODU model:
ODU p/n:
ODU s/n:
ODU SW:
Tx frequency (MHz):
Rx frequency (MHz):
Link ID:
Tx power (dBm):
ATPC on/off:
ATPC ref level:
ODU Polarization:
3. ANTENNA AND ODU MOUNT
Site 1
Site 2
Antenna vendor and model:
Antenna size:
Mounting type:
Mounting losses: