Installation Guide for FibeAir IP-20F
Page 61 of 63
Ceragon Proprietary and Confidential
9.4
IP
-
20 Commissioning Log
The Commissioning Log is an integral part of the commissioning procedure and should
be filled in for each installed link.
The Commissioning Log gathers all relevant information regarding the installed link and
contains a checklist of all recommended commissioning tests.
Maintaining the Commissioning Log is important for tracking your installations, and to
provide essential data for Ceragon Networks.
Upon completing the Commissioning Log, send the log to Ceragon support center at
IP-20 LINK COMMISSIONING LOG
1. GENERAL INFORMATION
Customer:
Radio model:
Configuration:
Radio link code:
Site 1 name & add:
Site 2 name & add:
2. RFU
Site 1
Site 2