6.
Commissioning
When complete below described works fill in the
Commissioning log (chapter 6.3)
6.2
First turn on
NOTE:
Material damage due to incorrect handling!
6.1
Before commissioning
NOTE:
Material damage occurred due to
unprofessional operating!
Start-up without sufficient quantity of water
destroys device.
Turn on the HPe2/4CM and use it only if there
is sufficient quantity of water
HPe2/4CM must work with minimum pressure of
0.5 bars
.
Klijenta/korisni
ka uređaja uputite u
rukovanje uređajem.
Prior to commissioning for the first time, make sure that
the heating system is filled with water and vented
Check all electrical connections
Switch on circuit breakers (protective circuit)
Before turn on, test if the following elements and joints are
connecter correctly and work correctly:
Watertight of heating installation
All pipes connected into ducts
All electric connectors
6.3
Start-up log
Commissioning works
Measured values
Notes
1.
HPe2/4CM type
2.
Serial number
3.
Set thermostat regulation
4.
Fill and air-vent heating installation and
check sealing of all connectors
5.
Operating pressure established
• Checked expansion vessel pressure
_____________ bar
6.
Test safety devices
7.
Set electric connection according to local
regulations
8.
Test function
9.
Users informed, technical documentation
submitted
10.
Confirmation of professional
commissioning
Service seal / Signature / Date
Table
5:
Start-up log
Commissioning