After the rotary valve is properly attached to the burner, it is necessary to connect it to the electrical
cabinet in the intended place on the terminal block. An electrical wiring diagram is supplied with the
boiler, indicating the connection point for the rotary valve (symbol x24). Then it is necessary to turn
on the rotary valve (Dispenser) in the boiler control under the PIN for the installer and check the
correctness of the operation using a manual test.
2
Technical instructions
PelTec-Compact
17
Technical instructions
EKO-CKS P UNIT