
7
Manual test, Installation
FAN, PUMP P1, PUMP P2, VALVE CLOSE, VALVE OPEN
1.3.4. MANUAL TEST
- in this menu are options to test all boiler outputs
Fan
- test working of the flue gas fan
Pump P1
- test working of the pump P1
Pump P2
- test working of the pump P2 *
Valve open
- test opening the valve *
Valve close
- test closing the valve *
* NOTE: this functions are always shown in this menu but will work only if they are enabled in the configuration menu
1.3.5. INSTALLATION
Enter PASSWORD
(only authorized serviceman)
- this menu is used for setting boiler parameters -
only for authorized serviceman (PIN)
Technical instructions REGULATION
BioTec-C