3.4 Wiring 

 
Access the Gateway wiring connections by opening the cover. 
 
A readily accessible disconnect device shall be incorporated in the supply wiring. 

3.4.1 Supply 

Power 

The outdoor models of the Gateway enclosure are supplied with two holes for 3/4” 
conduit in the bottom of the enclosure.  The installer must use the proper fittings to 
maintain the weatherproof integrity of the enclosure.  

The manufacturer does not 

recommend adding additional holes to the enclosure.  However, if additional 
holes are added, proper Type 4 seals must be used to prevent water from 
leaking into the enclosure. 

 
The indoor models of the Gateway are supplied with two bushings installed for the 
user to connect DC supply and the Ethernet cable (if used for your model). 
 
The Gateway is a Category II device. 

The outdoor models of the Gateway require an external SELV source of 12-24V 
DC. 

The indoor models of the Gateway require the use of a 12 – 24V DC supply. 

The wiring must be in accordance with any national, state and/or local regulations. 
This equipment is considered Class 1 which uses a protective earth ground. 

Verify that the cables from the cover to the printed circuit board are properly 
connected.  Close the cover and secure the two latches. 

Fuses F1 and F2 are permanently soldered on the PCB. They are installed only for 
catastrophic failure and are not considered serviceable by an end user. The 
connections for this power are located as follows: 

Warning

: Remove all power to the board before opening 

the enclosure for service. Electric shock or 
deathcouldoccur. 
 

Avertissement

: Enlevez tout le pouvoir de la planche avant 

d'ouvrir la clôture pour le service. Le décharge électrique ou 
la mort pourraient se produire. 

Gateway Instruction Manual 

Page 8 

 

 

 

 

3.4.2 

Backup Battery (Optional) 

If you purchased a Gateway with a backup battery, the following information 
applies. 
 
The approved battery for use is an 18650 series rechargeable Li-Ion battery.  These 
are 3.7V cylindrical batteries with 2200mAh capacity. 
 
The procedure for changing the battery in the field is to open the housing and pull 
out the old battery and insert the new battery.  Make sure that it is installed properly 
(with the “+” terminal to the middle of the board.  The “–“ terminal is toward the edge 
of the board at the bottom).  
 

DC power input:  
12-24VDC +/- shown

 

Summary of Contents for CGW Series

Page 1: ...dental or consequential damages in connection with the furnishing performance or use of this material The manufacturer assumes no responsibility for the use or reliability of its products or equipment other than that for which it is intended or for use other than in the manner prescribed herein This document is protected by copyright All rights reserved No part of this document may be reproduced c...

Page 2: ...onnected equipment This means that the Gateway should be fastened to a support and electrically connected to its supply by a permanent connection 2 Product Overview 2 1 Description The Gateway consists of a transceiver that collects Monitor information and either a cellular modem or Ethernet port that relays this information to a centralized data collector 2 2 Operation The Gateway can receive Rad...

Page 3: ...ignals and cause an RF shadow which may prevent radio signals from reaching the Gateway Objects which are not electrically conductive such as wooden or fiberglass buildings non reinforced masonry trees plastic and glass have less effect on radio signals than metal objects Windows and wooden doors can provide radio signals access to otherwise closed metal buildings However low E window glass may ha...

Page 4: ...pment is considered Class 1 which uses a protective earth ground Verify that the cables from the cover to the printed circuit board are properly connected Close the cover and secure the two latches Fuses F1 and F2 are permanently soldered on the PCB They are installed only for catastrophic failure and are not considered serviceable by an end user The connections for this power are located as follo...

Page 5: ...an incorrect type Dispose of used batteries according to the instructions Prudence Le Risque d Explosion si la batterie est remplacée par un type incorrect Débarrassez vous des batteries utilisées selon les instructions Gateway Instruction Manual Page 10 The Data Center light indicates Data Center communication status The Data Center light blinks approximately once per second any time Gateway is p...

Page 6: ...e All commands are typed in and pressing enter executes the command 5 2 Gateway Admin Console Application To access the administrator console application type the following on the command line gwadmin option parameters The command line is case sensitive and spaces separate the option and its parameter s The following is the list of available options Gateway Instruction Manual Page 12 Option case s...

Page 7: ...nd can be confirmed byobserving the Data Center light as it transitions from red to yellow and then to flashing green as it waits for communication from the Data Center To return to the default setup of using a DHCP server for assigning the IP address enter the following command gwadmin setstaticip 0 1 Enable Static IP Addressing 0 Enable DHCP IP addressing setstaticip EnableStaticIP Enable Disabl...