![Cellartec CT1500ZD Installation, Use & Care Manual Download Page 15](http://html1.mh-extra.com/html/cellartec/ct1500zd/ct1500zd_installation-use-and-care-manual_2580340015.webp)
- 14 -
Fig. 2.11 TOP EXHAUST GASKET
Fig. 2.12 WALL GRILLE
4. Cellar Construction
This is only a guide and shall be considered as minimum requirements.
All interior walls and floors shall have a vapor barrier and a minimum of R13
insulation. All exterior walls and ceiling shall have a vapor barrier and a minimum
of R19 insulation. The vapor barrier shall be installed on the warm side of the
insulation. All joints, door frames, electrical outlets or switches and any pipes or
vents that go through the cellar shall be sealed to prevent air and moisture
leakage into the cellar. Concrete, rock, and brick are not insulation or vapor
barriers.
Summary of Contents for CT1500ZD
Page 5: ...4 Fig 1 2 CT3500 8500ZD FEATURE DESCRIPTIONS Fig 1 3 CT1500 2500ZD DIMENSIONS...
Page 9: ...8 Fig 2 2 THREAD INSERT Fig 2 3 REAR GASKET...
Page 10: ...9 Fig 2 4 TOP EXHAUST GASKET Fig 2 5 COOLING UNIT MOUNTING...
Page 11: ...10 Fig 2 6 SECURING BRACKET SCREW...
Page 12: ...11 Fig 2 7 CABINET GRILLE...