13
V10.19
Condensate Drain Line
The condensate drain line should drop, then rise (but stay below the height of the
fitting), and then drop again into an open drain. Then, fill the trap with water. The
condensate trap will allow any excess moisture inside the Evaporator to
overcome the static pressure and flow out of the drain line. Before putting the unit
into service, test for positive drainage by pouring water into the drain pan and
observing flow through to the final drain.
Summary of Contents for 4000Shwc
Page 1: ...V10 19 ControltheElements SplitWaterCooled RefrigerationSystems Owner sManual...
Page 6: ...6 V10 19 Evaporator Cut Sheets...
Page 7: ...7 V10 19 Condensing Unit Cut Sheets...
Page 16: ...16 V10 19 Wiring Diagrams Option A Dual Power Valve Control Models 4000Swc 4000Shwc...
Page 17: ...17 V10 19 Wiring Diagrams Option A Dual Power Valve Control Model 8000Swc...
Page 19: ...19 V10 19 Wiring Diagram Option B Single Power Electronic Control Models 4000Swc 4000Shwc...
Page 20: ...20 V10 19 Wiring Diagram Option B Single Power Electronic Control Models 8000Swc...