23
V3.15.22
12.
3000Shqc-EC/4000Shqc-EC systems (rear connections only): Attach
adhesive backed insulation strips by removing the white backing and
securing to the evaporator back panel. The foam should form a box around
the connections as shown:
13.
Move the evaporator into position and secure to the interior cellar wall.
14.
DO NOT PLUG IN THE EVAPORATOR POWER CORD AT THIS TIME.
15.
From the exterior cellar wall, pack loose insulation into the wall cutout, and
drywall trim around the connections as desired. For serviceability, do not
use spray foam to insulate around the metal QuickConnect fittings.
16.
Route the drain line, installing a trap as shown on the “Drain Trap Detail”
drawing.
17.
Place the condensing unit in a location that has sufficient ventilation per the
guidance provided in Section IV.
18.
Route the Liquid and Suction lines to the condensing unit. Coil any slack
line at ground level near or under the condensing unit base.
19.
Locate the male Line Set connections on the Condensing Unit.
Blue suction
connection
Red liquid
connection
Condensing Unit power cord